COEUR D'ALENE, Idaho--(BUSINESS WIRE)--
Hecla Mining Company (NYSE:HL)
today announced third quarter financial and operating results.
HIGHLIGHTS
-
Net loss applicable to common shareholders of $23.3 million, or $0.05
per share on lower prices of all four metals.
-
Cost of sales and other direct production costs and depreciation,
depletion and amortization ("cost of sales") of $137.1 million.
-
Gross profit of $6.6 million and adjusted EBITDA of $40.3 million.1
-
Silver production of 2.5 million ounces at cash cost, after by-product
credits, of $4.12 per ounce.2
-
Gold production of 72,995 ounces, up 16%, mainly due to additional
ounces from Nevada.
- Casa Berardi All In Sustaining Costs ("AISC"), after by-product
credits, reduced to $896 per gold ounce, on higher throughput and
lower stripping costs.3
-
Aggressive $12 million exploration spending was highest in Company
history (see exploration press release issued November 6, 2018).
-
Strong financial position: Cash and cash equivalents of $60.9 million
at September 30, 2018. Revolving line of credit undrawn at quarter
end. Credit limit increased to $250 million on November 1, 2018.
-
Estimates for annual Company-wide silver and gold production and costs
are refined.
"Our strategy is working. The EBITDA we generated despite low metals
prices is a result of the improvements we made in our mines. A case in
point is Casa Berardi, which is generating strong cash flow, with lower
costs, higher mine throughput and an extended mine life," said Phillips
S. Baker, Jr., President and CEO. "The Nevada operations are on the same
path as Casa Berardi and Greens Creek, with the development and
processes which should increase throughput and make the mines more
efficient. In the meantime, the higher costs in Nevada are short-term
and a function of electing to produce less to avoid sterilizing newly
discovered mineralization."
"Greens Creek has been in production for about 30 years, but the mine
continues to improve with a new mine plan that significantly increases
its value. San Sebastian continues to mine the underground oxide ores
and is on the verge of collecting the sulfide bulk sample which could
supplement current production as well as significantly extend mine life.
At Lucky Friday, our salaried employees are now focusing on production,
rather than development, to minimize the financial impact of the strike.
Finally, we don't have any large capital projects looming, and we plan
to operate at a cash neutral basis, using our $250 million revolving
line of credit sparingly to temporarily fund working capital
requirements. We do not consider it a long-term source of borrowing,"
Mr. Baker added.
FINANCIAL OVERVIEW |
|
| Third Quarter Ended |
| Nine Months Ended |
| HIGHLIGHTS |
| September 30, 2018 |
| September 30, 2017
|
| September 30, 2018 |
| September 30, 2017
|
| FINANCIAL DATA |
|
|
|
|
|
|
|
|
|
Sales (000)
| | $143,649 | |
| $140,839 | | | $430,617 | |
| $417,662 |
|
Gross profit (000)
| | $6,576 | | | $42,963 | | | $80,364 | | | $106,139 |
|
(Loss) income applicable to common shareholders (000)
| | ($23,322 | ) | | $176 | | | ($3,284 | ) | | $33 |
|
Basic and diluted (loss) income per common share
| | ($0.05 | ) | |
$—
| | | ($0.01 | ) | |
$—
|
|
(Loss) income (000)
| | ($23,184 | ) | | $314 | | | ($2,870 | ) | | $447 |
|
Cash provided by operating activities (000)
| | $28,192 | | | $28,294 | | | $75,210 | | | $74,115 |
| | | | | | | | | | |
|
Net loss applicable to common shareholders for the third quarter was
$23.3 million, or $0.05 per share, compared to net income of $0.2
million, or $0.00 per share, for the same period a year ago, the result
mainly due to the following items:
-
Sales of $143.6 million were impacted by lower silver and gold
production at San Sebastian and Greens Creek, offset by the addition
of Nevada sales in the third quarter 2018.
-
Lower realized silver and gold metals prices, as well as lower
realized base metals prices.
-
Gain on base metal derivatives contracts of $19.5 million, which was
net of realized gains on contracts monetized for cash proceeds of
$32.8 million in the quarter.
-
Net foreign exchange loss of $2.2 million versus a loss of $4.9
million in the third quarter of 2017 due to a weakening of the
Canadian dollar.
-
Interest expense, net of amount capitalized, of $10.1 million in the
third quarter of 2018, increased over the $9.4 million recognized in
the third quarter of 2017.
-
An increase of $4.6 million in exploration and pre-development
expenditures over the third quarter of 2017, particularly focused on
Nevada and San Sebastian operations.
-
Suspension-related costs of $6.5 million included Lucky Friday costs,
as well as $1.1 million for curtailment of production from the Midas
Mine in Nevada, along with $1.4 million in non-cash depreciation
expense, in the third quarter of 2018.
-
Acquisition costs of $6.1 million recorded in the third quarter 2018.
Operating cash flow was $28.2 million compared to $28.3 million in the
third quarter of 2017, and included the proceeds received by monetizing
the base metals hedges, offset by the net loss and lower working capital
changes recorded in the third quarter 2018.
Adjusted EBITDA was $40.3 million compared to $60.5 million in the third
quarter of 2017, with the decrease mainly due to lower base metals
prices, higher exploration expense due to the addition of Hecla Nevada,
and acquisition costs recorded in the third quarter 2018.
Capital expenditures (excluding capitalized interest) totaled $40.7
million for the third quarter 2018 compared to $25.5 million in the
third quarter of 2017, with the increase mainly due to the addition of
Hecla Nevada, capitalization of costs recorded in the third quarter 2018
for the Remote Vein Miner (RVM) project at Lucky Friday, and costs
related to underground sulfide development at San Sebastian, partly
offset by lower capital spending at Casa Berardi. Expenditures at the
operations were $15.0 million at Hecla Nevada, $11.0 million at Greens
Creek, $8.2 million at Casa Berardi, $4.8 million at Lucky Friday and
$1.6 million at San Sebastian.
Metals Prices
The average realized silver price in the third quarter 2018 was $14.68
per ounce, 14% lower than the $17.01 price realized in the third quarter
of 2017. The average realized gold price in the third quarter was $1,205
per ounce, 6% lower than the prior year period. Realized lead and zinc
prices decreased by 13%, and 22% respectively, from the third quarter of
2017.
OPERATIONS OVERVIEW
Overview
The following table provides the production summary on a consolidated
basis for the third quarter and nine months ended September 30, 2018 and
2017:
|
| | Third Quarter Ended |
| Nine Months Ended |
|
|
|
| September 30, 2018 |
| September 30, 2017
|
| September 30, 2018 |
| September 30, 2017
|
| PRODUCTION SUMMARY |
|
|
|
|
|
|
|
Silver -
| |
Ounces produced
| 2,523,691 |
|
3,323,157
| | | 7,654,118 |
|
9,500,058
|
| |
Payable ounces sold
| 2,588,478 | |
2,540,817
| | | 6,993,695 | |
8,098,652
|
|
Gold -
| |
Ounces produced
| 72,995 | |
63,046
| | | 191,116 | |
171,720
|
| |
Payable ounces sold
| 68,568 | |
57,380
| | | 183,050 | |
161,921
|
|
Lead -
| |
Tons produced
| 4,238 | |
5,370
| | | 15,387 | |
18,426
|
| |
Payable tons sold
| 3,986 | |
2,936
| | | 12,599 | |
13,612
|
|
Zinc -
| |
Tons produced
| 12,795 | |
14,497
| | | 42,312 | |
43,000
|
| |
Payable tons sold
| 9,282 | |
8,444
| | | 30,072 | |
29,269
|
| | | | | | | | | |
|
The following tables provide a summary of the final production, cost of
sales, cash cost, after by-product credits, per silver and gold ounce,
and AISC, after by-product credits, per silver and gold ounce for the
third quarter and nine months ended September 30, 2018:
| Third Quarter Ended |
| |
| |
| Greens Creek |
| Lucky Friday |
| San Sebastian |
| Casa Berardi |
| Nevada Ops |
| Sept 30, 2018 |
| Silver |
| Gold |
| Silver |
| Gold |
| Silver |
| Silver |
| Gold |
| Gold |
| Silver |
| Gold |
| Silver |
|
Production (ounces)
|
|
2,523,691
|
|
|
72,995
|
|
|
1,876,417
|
|
|
11,559
|
|
|
31,639
|
|
|
521,931
|
|
|
3,666
|
|
|
43,981
|
|
|
9,559
|
|
|
13,789
|
|
84,145
|
|
Increase/(decrease) over 2017
|
|
(24
|
)%
|
|
16
|
%
|
|
(20
|
)%
|
|
(8
|
)%
|
|
(64
|
)%
|
|
(41
|
)%
|
|
(42
|
)%
|
|
—
|
%
|
|
(1
|
)%
|
|
N/A
|
|
N/A
|
|
Cost of sales & other direct production costs and depreciation,
depletion and amortization (000)
|
|
$
|
66,487
|
|
|
$
|
70,586
|
|
|
$
|
52,163
|
|
|
N/A
|
|
|
N/A
|
|
|
$
|
14,325
|
|
|
N/A
|
|
|
$
|
51,267
|
|
|
N/A
|
|
|
$
|
19,319
|
|
N/A
|
|
Increase/(decrease) over 2017
|
|
37
|
%
|
|
43
|
%
|
|
24
|
%
|
|
N/A
|
|
|
N/A
|
|
|
114
|
%
|
|
N/A
|
|
|
4
|
%
|
|
N/A
|
|
|
N/A
|
|
N/A
|
|
Cash costs, after by-prod credits, per silver or gold ounce 2,4 |
|
$
|
4.12
|
|
|
$
|
803
|
|
|
$
|
1.92
|
|
|
N/A
|
|
|
N/A
|
|
|
$
|
12.02
|
|
|
N/A
|
|
|
$
|
686
|
|
|
N/A
|
|
|
$
|
1,179
|
|
N/A
|
|
Increase/(decrease) over 2017
|
|
(754
|
)%
|
|
7
|
%
|
|
(1,380
|
)%
|
|
N/A
|
|
|
N/A
|
|
|
485
|
%
|
|
N/A
|
|
|
(9
|
)%
|
|
N/A
|
|
|
N/A
|
|
N/A
|
|
AISC, after by-prod credits,
per silver or gold ounce 3 |
|
$
|
15.68
|
|
|
$
|
1,143
|
|
|
$
|
9.20
|
|
|
N/A
|
|
|
N/A
|
|
|
$
|
16.95
|
|
|
N/A
|
|
|
$
|
896
|
|
|
N/A
|
|
|
$
|
1,932
|
|
N/A
|
|
Increase/(decrease) over 2017
|
|
136
|
%
|
|
5
|
%
|
|
106
|
%
|
|
N/A
|
|
|
N/A
|
|
|
2,142
|
%
|
|
N/A
|
|
|
(18
|
)%
|
|
N/A
|
|
|
N/A
|
|
N/A
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Nine Months Ended | | | | | | Greens Creek | | Lucky Friday | | San Sebastian | | Casa Berardi | | Nevada Ops |
| Sept 30, 2018 |
| Silver |
| Gold |
| Silver |
| Gold |
| Silver |
| Silver |
| Gold |
| Gold |
| Silver |
| Gold |
| Silver |
|
Production (ounces)
|
|
7,654,118
|
|
|
191,116
|
|
|
5,789,440
|
|
|
38,396
|
|
|
156,015
|
|
|
1,593,770
|
|
|
12,051
|
|
|
126,880
|
|
|
30,748
|
|
|
13,789
|
|
84,145
|
|
Increase/(decrease) over 2017
|
|
(19
|
)%
|
|
11
|
%
|
|
(7
|
)%
|
|
(2
|
)%
|
|
(80
|
)%
|
|
(36
|
)%
|
|
(37
|
)%
|
|
12
|
%
|
|
15
|
%
|
|
N/A
|
|
N/A
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization (000)
|
|
$
|
178,784
|
|
|
$
|
171,469
|
|
|
$
|
141,763
|
|
|
N/A
|
|
|
$
|
5,844
|
|
|
$
|
31,177
|
|
|
N/A
|
|
|
$
|
152,150
|
|
|
N/A
|
|
|
$
|
19,319
|
|
N/A
|
|
Increase/(decrease) over 2017
|
|
3
|
%
|
|
24
|
%
|
|
1
|
%
|
|
N/A
|
|
|
(60
|
)%
|
|
70
|
%
|
|
N/A
|
|
|
10
|
%
|
|
N/A
|
|
|
N/A
|
|
N/A
|
Cash costs, after by-prod credits, per silver or gold ounce 2,4 |
|
$
|
0.05
|
|
|
$
|
802
|
|
|
$
|
(2.22
|
)
|
|
N/A
|
|
|
N/A
|
|
|
$
|
8.28
|
|
|
N/A
|
|
|
$
|
760
|
|
|
N/A
|
|
|
$
|
1,179
|
|
N/A
|
|
Increase/(decrease) over 2017
|
|
(69
|
)%
|
|
(7
|
)%
|
|
(404
|
)%
|
|
N/A
|
|
|
N/A
|
|
|
356
|
%
|
|
N/A
|
|
|
(11
|
)%
|
|
N/A
|
|
|
N/A
|
|
N/A
|
|
AISC, after by-prod credits, per silver or gold ounce 3 |
|
$
|
10.71
|
|
|
$
|
1,095
|
|
|
$
|
4.71
|
|
|
N/A
|
|
|
N/A
|
|
|
$
|
13.34
|
|
|
N/A
|
|
|
$
|
1,004
|
|
|
N/A
|
|
|
$
|
1,932
|
|
N/A
|
|
Increase/(decrease) over 2017
|
|
33
|
%
|
|
(11
|
)%
|
|
(16
|
)%
|
|
N/A
|
|
|
N/A
|
|
|
9,629
|
%
|
|
N/A
|
|
|
(18
|
)%
|
|
N/A
|
|
|
N/A
|
|
N/A
|
| | | | | | | | | |
| | | | | | | | |
| | | | | |
| | | | |
| |
Greens Creek Mine - Alaska
At the Greens Creek mine, 1.9 million ounces of silver and 11,559 ounces
of gold were produced in the third quarter, compared to 2.3 million
ounces and 12,563 ounces, respectively, in the third quarter of 2017.
Lower silver production was expected as a result of lower grades due to
mine sequencing. The mill operated at an average of 2,316 tons per day
(tpd) in the third quarter, 3% lower than the third quarter of 2017.
The cost of sales for the third quarter was $52.2 million, and the cash
cost, after by-product credits, per silver ounce, was $1.92, compared to
$41.9 million and ($0.15), respectively, for the third quarter of 2017.2
The AISC, after by-product credits, was $9.20 per silver ounce for the
third quarter compared to $4.47 in the third quarter of 2017.3
The per ounce silver costs were higher primarily due to lower base
metals prices and the number of tons milled.
A new 2019 mine plan should reduce the amount of development in the next
four years to access significant ore reserves at shallower depth in
proximity to old workings (East Ore). It also utilizes existing
workings, rather than developing a new ramp system, to access these
materials and brings this higher-grade ore into production beginning in
2019, instead of near the end of the mine life, which should increase
revenues over the next few years. The combination of exploration success
over the past year and the optimization of sequencing should enable the
mine life to be maintained or extended.
"When we acquired Greens Creek, our goal was consistency of production
at an increased throughput. Having achieved that we moved to continuous
improvements like the increased recoveries in the mill. Now we have
identified a new mine plan that improves the mine's economics by
increasing production, reducing both development and the mining fleet
while potentially extending the mine life. The improvements we have made
to this mine demonstrate the importance of having a long mine life that
allows the time to make improvements and realize their benefits," said
Mr. Phillips S. Baker, Jr.
Casa Berardi - Quebec
At the Casa Berardi mine, 43,981 ounces of gold were produced in the
third quarter, the second highest quarterly gold production since
acquisition, including 7,614 ounces from the East Mine Crown Pillar
(EMCP) pit; compared to 44,141 ounces in the third quarter of 2017. The
steady production was primarily due to ore throughput. The mill operated
at an average of 3,846 tpd in the third quarter, the highest rate since
acquisition, and an increase of 8% over the third quarter of 2017.
The cost of sales was $51.3 million for the third quarter and the cash
cost, after by-product credits, per gold ounce was $686, compared to
$49.3 million and $750, respectively, in the prior year period.2,4 The
decrease in cash cost, after by-product credits, per gold ounce is due
to the higher gold production. The AISC, after by-product credits, was
$896 per gold ounce for the third quarter compared to $1,091 in the
third quarter of 2017, primarily due to lower capital spending.3
The automated 985 drift project continues to improve the operating
efficiency of the mine, with the autonomous haul truck running better
and with higher availability than originally anticipated. The second
40-ton Sandvik autonomous haul truck is scheduled to arrive in the
fourth quarter. Operating two autonomous trucks is expected to result in
operating savings of several million dollars a year.
"Casa Berardi was the standout mine for us this quarter. The
improvements and innovations we have made in the mine are paying off
with the declining cost profile, higher gold production and cash flow on
record throughput," said Mr. Phillips S. Baker, Jr. "We are very proud
of the cover story on Casa Berardi in CIM's September/October issue."
San Sebastian - Mexico
At the San Sebastian mine, 521,931 ounces of silver and 3,666 ounces of
gold were produced in the third quarter, compared to 880,885 ounces and
6,342 ounces, respectively, in the third quarter of 2017. The lower
silver and gold production was expected as a result of lower grades. The
mill operated at an average of 432 tpd, an increase of 9% over the third
quarter of 2017.
The cost of sales was $14.3 million for the third quarter and the cash
cost, after by-product credits, was $12.02 per silver ounce, compared to
$6.7 million and ($3.12), respectively, in the third quarter of 2017.2
The AISC, after by-product credits, was $16.95 per silver ounce for the
third quarter compared to ($0.83) in the third quarter of 2017,
principally due to the higher costs of mining underground versus
higher-grade stockpiles and work being conducted on the Velardeña
tailings facility.3 The Company plans to process a bulk
sample by the end of the year with revenues expected in the first
quarter of 2019. If successful, this could lead to the beginning of
mining of the sulfides by late 2019.
"The upcoming bulk sample of the Hugh Zone sulfide material could
significantly increase the mine life. We plan to continue our "capital
lite" strategy here since we already have a contract with a third-party
mill and anticipate using a contract miner. With almost no capital at
risk, the returns on the investment have been extraordinary," said Mr.
Phillips S. Baker, Jr.
Nevada Operations (acquired on July 20, 2018)
For the period July 20 to September 30, 2018, 13,789 ounces of gold were
produced. The Nevada operations are focused on development and
exploration activities at Fire Creek and Hollister at the expense of
production. Little development had been undertaken during 2018 at these
properties by the former owners. Our expectation is to increase Fire
Creek throughput from 350 tons per day to 550 tons per day by mid-2019.
The development of a drift to the Hatter Graben exploration target is
underway with completion expected late in 2019.
During the reporting period, approximately $15.0 million in capital and
$4.5 million in exploration expense was invested in Nevada. Of the $15.0
million in capital, $7.3 million related to the completion of the
tailings facility at Midas which should provide the necessary waste
capacity for the next four years, while $7.0 million was for development
that is needed to increase Fire Creek and Hollister mine throughput, and
$0.7 million was spent on completing the CIL circuit at the Midas Mill
which is expected to increase the recoveries of the ore being processed
from Hollister.
Notable highlights include:
-
General
-
Movement of personnel and equipment to Fire Creek and Hollister is
substantially complete.
-
Midas
-
Production at Midas is winding down with minimal production of
previously developed ore planned until year end.
-
Midas mill CIL tanks are operational, and completion of the
remaining installation work is expected in the fourth quarter.
-
New tailings storage facility is on track for completion in 2018.
- Fire Creek
-
Now fully staffed (with the addition of the Midas crews).
-
Ground conditions are improving and new in-cycle procedures have
been developed for consistent development advance rates.
-
The ramp-up in development is proceeding with the addition of more
headings.
-
Installation of the shotcrete plant is nearing completion, will be
added to the development cycle to mitigate ground issues and
support rehabilitation of existing haulage ways.
-
The mining of select high-grade zones has been moved from Q3 2018
into 2019 as the ore extended vertically farther than expected,
and development is needed for full extraction of the ore panels.
- Hollister/Hatter Graben
-
Development of the Hatter Graben is ahead of schedule with about
10% of the footage completed.
"In the 100 days we have owned the Nevada properties we have been in
continuous change - winding down Midas, resolving the roadbed issues at
Fire Creek, advancing the development at Hatter Graben, and completing
the capital projects on the mill and tailings facility. We expect the
pace of change to continue as we commission a new batch plant that
should improve ground control, test a road-header to improve mining in
soft rock and rework the mine plan as we gain more knowledge. However,
we don't believe we will need to make significant new financial
investment to put the mine on the same improvement path that we have
seen at Greens Creek and Casa Berardi," said Mr. Phillips S. Baker, Jr.
Lucky Friday Mine - Idaho
At the Lucky Friday mine, 31,639 ounces of silver were produced in the
third quarter, compared to 88,298 ounces in the third quarter of 2017,
with the salaried workers focused mostly on development.
There was no cost of sales for the third quarter, as there were no
concentrate shipments during the quarter.
The Company is now focusing on limited production by salaried staff to
help minimize the financial impact of the ongoing strike. In addition,
construction of the Remote Vein Miner (RVM) continues in Sweden. The RVM
has the potential to revolutionize how the mine operates, making it
safer and more efficient. Costs related to care-and-maintenance of the
mine are reported in a separate line item in our condensed consolidated
statement of operations and are excluded from the calculation of cost of
sales, cash cost, after by-product credits, per silver ounce and AISC,
after by-product credits, per silver ounce.
"Lucky Friday has the longest mine life of all our properties, but at
these silver prices and with the work rules the union workers have clung
to, even at full production the mine doesn't generate significant free
cash flow. So, we are operating to minimize the cash consumption before
we go back into production which we expect to be primarily from the
RVM," said Phillips S. Baker, Jr.
EXPLORATION AND PRE-DEVELOPMENT
Expenditures
Exploration (including corporate development) expenses were $12.4
million, an increase of $5.2 million compared to the third quarter of
2017. Full year exploration (including corporate development) expenses
are expected to be $35 million, up from $23.5 million in 2017, in part
reflecting exploration at the Nevada operations, San Sebastian, Casa
Berardi and Greens Creek and drilling at Kinskuch and Little Baldy.
A complete summary of exploration for the third quarter can be found in
the news release entitled "Hecla Reports Continued Drilling Success in
the Third Quarter" released on November 6, 2018.
"This quarter's exploration, at $12 million, is 60% more than any
quarter in the past five years primarily as a result of adding Nevada
exploration to an already substantial program. While there are good
results from all the programs, we plan to pare back future expenditures
to operate within cash flow," said Mr. Phillips S. Baker, Jr.
PRE-DEVELOPMENT
Pre-development spending was $1.2 million for the quarter, for
permitting of Rock Creek and Montanore.
In August, the U.S. Forest Service issued its Final Record of Decision
(ROD) authorizing Phase 1, which is the exploration phase, for Rock
Creek.
At the Montanore project, the Forest Service continues to work on a
Supplemental Environmental Impact Statement (EIS), pursuant to the 2017
Montana Federal District Court remand of the previous Forest Service
ROD. The court's decision allows the agency to advance authorizations
for the initial evaluation phase of the project. A draft Supplemental
EIS is anticipated in the first half of 2019.
BASE METALS AND CURRENCY HEDGING
Base Metals Forward Sales Contracts
There are no forward sales contracts outstanding at this time, other
than provisional hedges (which address changes in prices between
shipment and settlement with customers).
Foreign Currency Forward Purchase Contracts
The following table summarizes the quantities of Canadian dollars and
Mexican pesos committed under financially settled forward purchase
contracts at September 30, 2018:
|
| Currency Under Contract (in thousands of CAD/MXN) |
| Average Exchange Rate |
| | CAD |
| MXN | | CAD/USD |
| MXN/USD |
|
2018 settlements
| |
29,300
|
|
47,110
| | |
1.30
|
|
19.66
|
|
2019 settlements
| |
91,200
| |
124,320
| | |
1.31
| |
20.28
|
|
2020 settlements
| |
61,700
| |
7,100
| | |
1.29
| |
20.72
|
|
2021 settlements
| |
36,500
| |
—
| | |
1.28
| |
—
|
|
2022 settlements
| |
6,400
| |
—
| | |
1.27
| |
—
|
| | | | | | | | |
|
2018 ESTIMATES5
The Company is providing updated annual estimates as follows:
2018 Production Outlook
|
|
|
|
| Silver Production (Moz) |
|
| Gold Production (Koz) |
|
| Silver Equivalent (Moz) |
|
| Gold Equivalent (Koz) |
|
|
|
|
| Original (if revised) |
|
| Current |
|
| Original (if revised) |
|
| Current |
|
| Original (if revised) |
|
| Current |
|
| Original (if revised) |
|
| Current |
| Greens Creek |
|
|
|
7.5-8.1
|
|
|
7.6-7.9
|
|
|
50-55
|
|
|
50-53
|
|
|
21.0-22.5
|
|
|
21.1-22.1
|
|
|
300-315
|
|
|
301-310
|
| Lucky Friday |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| San Sebastian |
|
|
|
2.0-2.5
|
|
|
2.0-2.2
|
|
|
15-17
|
|
|
15-16
|
|
|
2.9-3.7
|
|
|
2.9-3.3
|
|
|
41-52
|
|
|
41-47
|
| Casa Berardi |
|
|
|
|
|
|
|
|
|
157-162
|
|
|
161-165
|
|
|
11.0-11.5
|
|
|
11.3-11.7
|
|
|
157-162
|
|
|
161-165
|
| Nevada Operations |
|
|
|
|
|
|
0.1-0.2
|
|
|
40-50
|
|
|
36-41
|
|
|
2.9-3.8
|
|
|
2.6-3.1
|
|
|
41-52
|
|
|
37-43
|
| Total |
|
|
|
9.5-10.6
|
|
| 9.7-10.3 |
|
|
262-284
|
|
| 262-275 |
|
|
37.8-41.5
|
|
| 37.9-40.2 |
|
|
539-581
|
|
| 540-565 |
|
|
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
2018 Cost Outlook
|
|
|
|
| Costs of Sales (million) |
|
| Cash cost, after by-product credits, per silver/gold ounce2,4 |
|
| AISC, after by-product credits, per produced silver/gold ounce3 |
|
|
|
|
| Original (if revised) |
|
| Current |
|
| Original (if revised) |
|
| Current |
|
| Original (if revised) |
|
| Current |
| Greens Creek |
|
|
|
$
|
198
|
|
|
$
|
183
|
|
|
|
$
|
(0.50
|
)
|
|
|
$
|
(1.00
|
)
|
|
|
$
|
7.00
|
|
|
|
$
|
6.00
|
| Lucky Friday |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| San Sebastian |
|
|
|
$
|
44
|
|
|
$
|
42
|
|
|
|
$
|
8.50
|
|
|
|
$
|
9.50
|
|
|
|
$
|
12.50
|
|
|
|
$
|
14.00
|
| Total Silver |
|
|
|
$
|
242
|
|
| $ | 225 |
|
|
| $ | 1.50 |
|
|
| $ | 1.00 |
|
|
| $ | 12.75 |
|
|
| $ | 12.25 |
| Casa Berardi |
|
|
|
$
|
185
|
|
|
$
|
203
|
|
|
|
$
|
800
|
|
|
|
$
|
775
|
|
|
|
$
|
1,100
|
|
|
|
$
|
1,050
|
| Nevada Operations |
|
|
|
$
|
68
|
|
|
$
|
64
|
|
|
|
$
|
800
|
|
|
|
$
|
1,275
|
|
|
|
$
|
1,100
|
|
|
|
$
|
1,875
|
| Total Gold |
|
|
|
$
|
253
|
|
| $ | 267 |
|
|
|
$
|
800
|
|
|
| $ | 850 |
|
|
|
$
|
1,100
|
|
|
| $ | 1,200 |
|
|
|
| |
|
| | | |
|
| | | |
|
| | | |
|
| | | |
|
| | |
2018 Capital and Exploration Outlook |
|
|
| Original (if revised) |
| Current |
| 2018E Capital expenditures (excluding capitalized interest) |
|
|
| $140-$145 million |
| 2018E Exploration expenditures (includes Corporate Development) |
| $34-$37 million |
| $35-$37 million |
| 2018E Pre-development expenditures |
| $5 million |
| $4 million |
| 2018E Research and Development expenditures |
| $6-$10 million |
| $7-$9 million |
|
| |
| |
DIVIDENDS
TheBoard of Directors declared a quarterly cash dividend of
$0.0025 per share of common stock, payable on or about December 3, 2018,
to stockholders of record on November 20, 2018. The realized silver
price was $14.68 in the third quarter and therefore did not satisfy the
criteria for a larger dividend under the Company's dividend policy.
The Board of Directors also declared the regular quarterly dividend of
$0.875 per share on the 157,816 outstanding shares of Series B
Cumulative Convertible Preferred Stock. This represents a total amount
to be paid of approximately $138,000. The cash dividend is payable on or
about January 2, 2019 to shareholders of record on December 14, 2018.
CONFERENCE CALL AND WEBCAST
A conference call and webcast will be held Thursday, November 8, at
10:00 a.m. Eastern Time to discuss these results. You may join the
conference call by dialing toll-free 1-855-760-8158 or for international
dialing 1-720-634-2922. The participant passcode is HECLA. Hecla's live
and archived webcast can be accessed at www.hecla-mining.com
under Investors or via Thomson StreetEvents Network.
ABOUT HECLA
Founded in 1891, Hecla Mining Company (NYSE:HL) is a leading low-cost
U.S. silver producer with operating mines in Alaska, Idaho, and Mexico
and is a growing gold producer with operating mines in Quebec, Canada
and in Nevada. The Company also has exploration and pre-development
properties in eight world-class silver and gold mining districts in the
U.S., Canada and Mexico.
NOTES
Non-GAAP Financial Measures
Non-GAAP financial measures are intended to provide additional
information only and do not have any standard meaning prescribed by
generally accepted accounting principles in the United States (GAAP).
These measures should not be considered in isolation or as a substitute
for measures of performance prepared in accordance with GAAP.
(1) Adjusted EBITDA is a non-GAAP measurement, a
reconciliation of which to net income (loss), the most comparable GAAP
measure, can be found at the end of the release. Adjusted EBITDA is a
measure used by management to evaluate the Company's operating
performance but should not be considered an alternative to net income
(loss), or cash provided by operating activities as those terms are
defined by GAAP, and does not necessarily indicate whether cash flows
will be sufficient to fund cash needs. In addition, the Company may use
it when formulating performance goals and targets under its incentive
program.
(2) Cash cost, after by-product credits, per silver or gold
ounce is a non-GAAP measurement, a reconciliation of which to cost of
sales and other direct production costs and depreciation, depletion and
amortization (sometimes referred to as "cost of sales" in this release),
can be found at the end of the release. It is an important operating
statistic that management utilizes to measure each mine's operating
performance. It also allows the benchmarking of performance of each mine
versus those of our competitors. As a primary silver mining company,
management also uses the statistic on an aggregate basis - aggregating
the Greens Creek, Lucky Friday and San Sebastian mines - to compare
performance with that of other primary silver mining companies. With
regard to Casa Berardi and the Nevada operations, management uses cash
cost, after by-product credits, per gold ounce to compare its
performance with other gold mines. Similarly, the statistic is useful in
identifying acquisition and investment opportunities as it provides a
common tool for measuring the financial performance of other mines with
varying geologic, metallurgical and operating characteristics. In
addition, the Company may use it when formulating performance goals and
targets under its incentive program. Cash cost, after by-product
credits, per silver ounce is not presented for Lucky Friday for the
third quarters of 2018 and 2017 and year to date 2018, as production was
limited due to the strike and results are not comparable to those from
prior periods and are not indicative of future operating results under
full production. The estimated fair value of the stockpile acquired at
Hollister has been removed from the cash cost, after by-product credits
calculation.
(3) All in sustaining cost (AISC), after by-product credits,
is a non-GAAP measurement, a reconciliation of which to cost of sales
and other direct production costs and depreciation, depletion and
amortization, the closest GAAP measurement, can be found in the end of
the release. AISC, after by-product credits, includes cost of sales and
other direct production costs, expenses for reclamation and exploration
at the mine sites, corporate exploration related to sustaining
operations, and all site sustaining capital costs. AISC, after
by-product credits, is calculated net of depreciation, depletion, and
amortization and by-product credits. AISC, after by-product credits, per
silver ounce is not presented for Lucky Friday for the second quarters
of 2018 and 2017 and the first half of 2018, as production was limited
due to the strike and results are not comparable to those from prior
periods and are not indicative of future operating results under full
production.
Current GAAP measures used in the mining industry, such as cost of goods
sold, do not capture all the expenditures incurred to discover, develop
and sustain silver and gold production. Management believes that all in
sustaining costs is a non-GAAP measure that provides additional
information to management, investors and analysts to help in the
understanding of the economics of our operations and performance
compared to other producers and in the investor's visibility by better
defining the total costs associated with production. Similarly, the
statistic is useful in identifying acquisition and investment
opportunities as it provides a common tool for measuring the financial
performance of other mines with varying geologic, metallurgical and
operating characteristics. In addition, the Company may use it when
formulating performance goals and targets under its incentive program.
(4) Cash cost, after by-product credits, per gold ounce is
only applicable to Casa Berardi and Nevada production. Gold produced
from Greens Creek and San Sebastian is treated as a by-product credit
against the silver cash cost.
Other
(5) Expectations for 2018 includes silver, gold, lead and
zinc production from Greens Creek, San Sebastian, Casa Berardi and
Nevada operations converted using Au $1,250/oz, Ag $16.00/oz, Zn
$1.25/lb, and Pb $1.00/lb. Lucky Friday expectations are currently
suspended as there is currently a strike. Numbers may be rounded.
Cautionary Statements to Investors on Forward-Looking Statements
This news release contains “forward-looking statements” within the
meaning of Section 27A of the Securities Act of 1933, as amended, and
Section 21E of the Securities Exchange Act of 1934, as amended, which
are intended to be covered by the safe harbor created by such sections
and other applicable laws, including Canadian securities laws. Such
forward-looking statements may include, without limitation: (i)
estimates of future production and sales; (ii) the impact of the Klondex
acquisition on the Company's operations and results; (iii) expectations
regarding the development, growth potential, financial performance of
the Company’s projects; (iv) ability to complete construction of the
remote vein miner and for it to operate successfully; (v) impact of the
Lucky Friday strike on production and cash flow; (vi) ability to
generate value from innovations being introduced into the mines; (vii)
impact of metals prices on cash costs, after by-product credits; and
(viii) ability to permit and timing of Montana projects. Estimates or
expectations of future events or results are based upon certain
assumptions, which may prove to be incorrect. Such assumptions, include,
but are not limited to: (i) there being no significant change to current
geotechnical, metallurgical, hydrological and other physical conditions;
(ii) permitting, development, operations and expansion of the Company’s
projects being consistent with current expectations and mine plans;
(iii) political/regulatory developments in any jurisdiction in which the
Company operates being consistent with its current expectations; (iv)
the exchange rates for the Canadian dollar and Mexican peso to the U.S.
dollar, being approximately consistent with current levels; (v) certain
price assumptions for gold, silver, lead and zinc; (vi) prices for key
supplies being approximately consistent with current levels; (vii) the
accuracy of our current mineral reserve and mineral resource estimates;
and (viii) the Company’s plans for development and production will
proceed as expected and will not require revision as a result of risks
or uncertainties, whether known, unknown or unanticipated. Where the
Company expresses or implies an expectation or belief as to future
events or results, such expectation or belief is expressed in good faith
and believed to have a reasonable basis. However, such statements are
subject to risks, uncertainties and other factors, which could cause
actual results to differ materially from future results expressed,
projected or implied by the “forward-looking statements.” Such risks
include, but are not limited to gold, silver and other metals price
volatility, operating risks, currency fluctuations, increased production
costs and variances in ore grade or recovery rates from those assumed in
mining plans, community relations, conflict resolution and outcome of
projects or oppositions, litigation, political, regulatory, labor and
environmental risks, and exploration risks and results, including that
mineral resources are not mineral reserves, they do not have
demonstrated economic viability and there is no certainty that they can
be upgraded to mineral reserves through continued exploration. For a
more detailed discussion of such risks and other factors, see the
Company’s 2017 Form 10-K, filed on February 15, 2018, and Forms 10-Q
filed on May 10, 2018 and August 9, 2018, with the Securities and
Exchange Commission (SEC), as well as the Company’s other SEC filings.
The Company does not undertake any obligation to publicly release
revisions to any “forward-looking statement,” including, without
limitation, outlook, to reflect events or circumstances after the date
of this news release, or to reflect the occurrence of unanticipated
events, except as may be required under applicable securities laws.
Investors should not assume that any lack of update to a previously
issued “forward-looking statement” constitutes a reaffirmation of that
statement. Continued reliance on “forward-looking statements” is at
investors’ own risk.
|
|
|
| |
|
|
| |
HECLA MINING COMPANY
Condensed Consolidated Statements of (Loss) Income
(dollars and shares in thousands, except per share amounts -
unaudited)
|
| | | | | | | |
|
| | | |
Third Quarter Ended
| | | |
Nine Months Ended
|
| | | | September 30, 2018 |
|
|
| September 30,
2017
| | | | September 30, 2018 |
|
|
| September 30,
2017
|
|
Sales of products
| | | | $ | 143,649 |
| | | |
$
|
140,839
|
| | | | $ | 430,617 |
| | | |
$
|
417,662
|
|
|
Cost of sales and other direct production costs
| | | | 93,609 | | | | |
68,358
| | | | | 246,918 | | | | |
224,537
| |
|
Depreciation, depletion and amortization
| | | | 43,464 |
| | | |
29,518
|
| | | | 103,335 |
| | | |
86,986
|
|
| | | | 137,073 |
| | | |
97,876
|
| | | | 350,253 |
| | | |
311,523
|
|
|
Gross profit
| | | | 6,576 |
| | | |
42,963
|
| | | | 80,364 |
| | | |
106,139
|
|
| | | | | | | | | | | | | | | |
|
|
Other operating expenses:
| | | | | | | | | | | | | | | | |
|
General and administrative
| | | | 10,327 | | | | |
9,529
| | | | | 27,849 | | | | |
29,044
| |
|
Exploration
| | | | 12,411 | | | | |
7,255
| | | | | 27,609 | | | | |
17,622
| |
|
Pre-development
| | | | 1,195 | | | | |
1,757
| | | | | 3,615 | | | | |
4,061
| |
|
Research and development
| | | | 1,269 | | | | |
1,130
| | | | | 5,042 | | | | |
2,125
| |
|
Other operating expense
| | | | 448 | | | | |
134
| | | | | 1,767 | | | | |
1,590
| |
|
Gain on disposition of properties, plants, equipment and mineral
interests
| | | | (3,208 | ) | | | |
(4,830
|
)
| | | | (3,374 | ) | | | |
(4,924
|
)
|
|
Provision or closed operations and reclamation
| | | | 1,852 | | | | |
2,940
| | | | | 4,534 | | | | |
5,044
| |
|
Suspension-related costs
| | | | 6,519 | | | | |
4,780
| | | | | 18,337 | | | | |
14,385
| |
|
Acquisition costs
| | | | 6,139 |
| | | |
—
|
| | | | 9,656 |
| | | |
25
|
|
| | | | 36,952 |
| | | |
22,695
|
| | | | 95,035 |
| | | |
68,972
|
|
|
Income from operations
| | | | (30,376 | ) | | | |
20,268
|
| | | | (14,671 | ) | | | |
37,167
|
|
|
Other income (expense):
| | | | | | | | | | | | | | | | |
|
Gain (loss) on derivative contracts
| | | | 19,460 | | | | |
(11,226
|
)
| | | | 40,271 | | | | |
(16,548
|
)
|
|
Loss on disposition of investments
| | | | (36 | ) | | | |
—
| | | | | (36 | ) | | | |
(167
|
)
|
|
Unrealized (loss) gain on investments
| | | | (2,207 | ) | | | |
(124
|
)
| | | | (2,461 | ) | | | |
(73
|
)
|
|
Foreign exchange (loss) gain
| | | | (2,212 | ) | | | |
(4,917
|
)
| | | | 2,856 | | | | |
(10,258
|
)
|
|
Interest income and other (expense) income
| | | | (346 | ) | | | |
541
| | | | | (294 | ) | | | |
1,185
| |
|
Interest expense, net of amount capitalized
| | | | (10,146 | ) | | | |
(9,358
|
)
| | | | (30,019 | ) | | | |
(28,423
|
)
|
| | | | 4,513 |
| | | |
(25,084
|
)
| | | | 10,317 |
| | | |
(54,284
|
)
|
|
(Loss) income before income taxes
| | | | (25,863 | ) | | | |
(4,816
|
)
| | | | (4,354 | ) | | | |
(17,117
|
)
|
|
Income tax benefit
| | | | 2,679 |
| | | |
5,130
|
| | | | 1,484 |
| | | |
17,564
|
|
|
Net (loss) income
| | | | (23,184 | ) | | | |
314
| | | | | (2,870 | ) | | | |
447
| |
|
Preferred stock dividends
| | | | (138 | ) | | | |
(138
|
)
| | | | (414 | ) | | | |
(414
|
)
|
|
(Loss) income applicable to common shareholders
| | | | $ | (23,322 | ) | | | |
$
|
176
|
| | | | $ | (3,284 | ) | | | |
$
|
33
|
|
|
Basic (loss) income per common share after preferred dividends
| | | | $ | (0.05 | ) | | | |
$
|
—
|
| | | | $ | (0.01 | ) | | | |
$
|
—
|
|
|
Diluted (loss) income per common share after preferred dividends
| | | | $ | (0.05 | ) | | | |
$
|
—
|
| | | | $ | (0.01 | ) | | | |
$
|
—
|
|
|
Weighted average number of common shares outstanding - basic
| | | | 452,636 |
| | | |
398,848
|
| | | | 417,532 |
| | | |
396,809
|
|
|
Weighted average number of common shares outstanding - diluted
| | | | 452,636 |
| | | |
401,258
|
| | | | 417,532 |
| | | |
400,176
|
|
| | | | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | | | |
|
|
|
|
|
|
|
|
| |
|
|
|
|
| |
HECLA MINING COMPANY
Condensed Consolidated Balance Sheets
(dollars and share in thousands - unaudited)
|
| | | | | | | | | | | | | |
|
|
|
|
|
|
|
|
|
| September 30, 2018 |
|
|
|
|
| December 31, 2017 |
| ASSETS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Current assets:
| | | | | | | | | | | | | | |
|
Cash and cash equivalents
| | | | | | | | $ | 60,856 | | | | | | |
$
|
186,107
| |
|
Short-term investments and securities
| | | | | | | | — | | | | | | |
33,758
| |
|
Accounts receivable:
| | | | | | | | | | | | | | |
|
Trade
| | | | | | | | 12,947 | | | | | | |
14,805
| |
|
Other, net
| | | | | | | | 26,928 | | | | | | |
17,385
| |
|
Inventories
| | | | | | | | 76,088 | | | | | | |
55,466
| |
|
Other current assets
| | | | | | | | 21,510 |
| | | | | |
13,715
|
|
|
Total current assets
| | | | | | | | 198,329 | | | | | | |
321,236
| |
|
Non-current investments
| | | | | | | | 7,190 | | | | | | |
7,561
| |
|
Non-current restricted cash and investments
| | | | | | | | 1,010 | | | | | | |
1,032
| |
|
Properties, plants, equipment and mineral interests, net
| | | | | | | | 2,487,429 | | | | | | |
1,999,311
| |
|
Non-current deferred income taxes
| | | | | | | | 1,601 | | | | | | |
1,509
| |
|
Other non-current assets and deferred charges
| | | | | | | | 14,699 |
| | | | | |
14,509
|
|
| Total assets | | | | | | | | $ | 2,710,258 |
| | | | | |
$
|
2,345,158
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| LIABILITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Current liabilities:
| | | | | | | | | | | | | | |
|
Accounts payable and accrued liabilities
| | | | | | | | $ | 65,755 | | | | | | |
$
|
46,549
| |
|
Accrued payroll and related benefits
| | | | | | | | 29,488 | | | | | | |
31,259
| |
|
Accrued taxes
| | | | | | | | 8,274 | | | | | | |
5,919
| |
|
Current portion of capital leases
| | | | | | | | 6,069 | | | | | | |
5,608
| |
|
Current portion of accrued reclamation and closure costs
| | | | | | | | 6,621 | | | | | | |
6,679
| |
|
Other current liabilities
| | | | | | | | 16,249 |
| | | | | |
16,116
|
|
|
Total current liabilities
| | | | | | | | 132,456 | | | | | | |
112,130
| |
|
Capital leases
| | | | | | | | 8,638 | | | | | | |
6,193
| |
|
Accrued reclamation and closure costs
| | | | | | | | 99,314 | | | | | | |
79,366
| |
|
Long-term debt
| | | | | | | | 534,067 | | | | | | |
502,229
| |
|
Non-current deferred tax liability
| | | | | | | | 164,928 | | | | | | |
124,352
| |
|
Non-current pension liability
| | | | | | | | 44,097 | | | | | | |
46,628
| |
|
Other non-current liabilities
| | | | | | | | 4,689 |
| | | | | |
12,983
|
|
| Total liabilities | | | | | | | | 988,189 |
| | | | | |
883,881
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| SHAREHOLDERS’ EQUITY |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Preferred stock
| | | | | | | | 39 | | | | | | |
39
| |
|
Common stock
| | | | | | | | 121,283 | | | | | | |
100,926
| |
|
Capital surplus
| | | | | | | | 1,872,946 | | | | | | |
1,619,816
| |
|
Accumulated deficit
| | | | | | | | (223,280 | ) | | | | | |
(218,089
|
)
|
|
Accumulated other comprehensive loss
| | | | | | | | (28,183 | ) | | | | | |
(23,373
|
)
|
| Treasury stock
| | | | | | | | (20,736 | ) | | | | | |
(18,042
|
)
|
| Total shareholders’ equity | | | | | | | | 1,722,069 |
| | | | | |
1,461,277
|
|
| Total liabilities and shareholders’ equity | | | | | | | | $ | 2,710,258 |
| | | | | |
$
|
2,345,158
|
|
|
Common shares outstanding
| | | | | | | | 479,909 | | | | | | |
399,176
| |
| | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | |
|
|
|
|
|
|
|
|
| |
HECLA MINING COMPANY
Condensed Consolidated Statements of Cash Flows(dollars in
thousands - unaudited)
|
| | | | | | | |
|
| | | | | | | |
Nine Months Ended
|
|
|
|
|
|
|
|
|
| September 30, 2018 |
|
|
|
| September 30,
2017
|
| OPERATING ACTIVITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Net (loss) income
| | | | | | | | $ | (2,870 | ) |
|
|
|
|
$
|
447
| |
|
Non-cash elements included in net (loss) income:
| | | | | | | | | | | | | |
|
Depreciation, depletion and amortization
| | | | | | | | 108,814 | | | | | |
91,255
| |
|
Loss on disposition of investments
| | | | | | | | — | | | | | |
167
| |
|
Gain on disposition of properties, plants, equipment and mineral
interests
| | | | | | | | (3,374 | ) | | | | |
(4,924
|
)
|
|
Unrealized loss on investments
| | | | | | | | 2,461 | | | | | |
73
| |
|
Adjustment of inventory to market value
| | | | | | | | 7,232 | | | | | |
—
| |
|
Provision for reclamation and closure costs
| | | | | | | | 3,957 | | | | | |
3,379
| |
|
Stock compensation
| | | | | | | | 4,672 | | | | | |
4,943
| |
|
Deferred income taxes
| | | | | | | | (4,637 | ) | | | | |
(23,467
|
)
|
|
Amortization of loan origination fees
| | | | | | | | 1,471 | | | | | |
1,415
| |
|
(Gain) loss on derivative contracts
| | | | | | | | (15,208 | ) | | | | |
16,718
| |
|
Foreign exchange (gain) loss
| | | | | | | | (2,032 | ) | | | | |
10,520
| |
|
Other non-cash items, net
| | | | | | | | (37 | ) | | | | |
(1
|
)
|
|
Change in assets and liabilities:
| | | | | | | | | | | | | |
|
Accounts receivable
| | | | | | | | (4,424 | ) | | | | |
4,903
| |
|
Inventories
| | | | | | | | (18,954 | ) | | | | |
(9,611
|
)
|
|
Other current and non-current assets
| | | | | | | | (5,569 | ) | | | | |
(2,685
|
)
|
|
Accounts payable and accrued liabilities
| | | | | | | | 12,308 | | | | | |
(7,759
|
)
|
|
Accrued payroll and related benefits
| | | | | | | | (4,207 | ) | | | | |
(913
|
)
|
|
Accrued taxes
| | | | | | | | 845 | | | | | |
(4,469
|
)
|
|
Accrued reclamation and closure costs and other non-current
liabilities
| | | | | | | | (5,238 | ) | | | | |
(5,876
|
)
|
| Cash provided by operating activities | | | | | | | | 75,210 |
| | | | | 74,115 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| INVESTING ACTIVITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Additions to properties, plants, equipment and mineral interests
| | | | | | | | (83,285 | ) | | | | |
(70,390
|
)
|
|
Acquisition of Klondex, net of cash and restricted cash acquired
| | | | | | | | (139,326 | ) | | | | |
—
| |
|
Proceeds from disposition of properties, plants and equipment
| | | | | | | | 722 | | | | | |
151
| |
|
Insurance proceeds received for damaged property
| | | | | | | | 4,377 | | | | | |
5,628
| |
|
Purchases of investments
| | | | | | | | (31,971 | ) | | | | |
(36,916
|
)
|
|
Maturities of short-term investments
| | | | | | | | 64,895 |
| | | | |
31,169
|
|
| Net cash used in investing activities | | | | | | | | (184,588 | ) | | | | | (70,358 | ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| FINANCING ACTIVITIES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Proceeds from issue of stock, net of related costs
| | | | | | | | 3,085 | | | | | |
9,610
| |
|
Acquisition of treasury shares
| | | | | | | | (2,694 | ) | | | | |
(2,993
|
)
|
|
Dividends paid to common shareholders
| | | | | | | | (3,193 | ) | | | | |
(2,978
|
)
|
|
Dividends paid to preferred shareholders
| | | | | | | | (414 | ) | | | | |
(414
|
)
|
|
Debt origination fees
| | | | | | | | (2,460 | ) | | | | |
(476
|
)
|
|
Repayments of debt
| | | | | | | | (82,036 | ) | | | | |
(470
|
)
|
|
Borrowings on debt
| | | | | | | | 78,024 | | | | | |
—
| |
|
Payments on capital leases
| | | | | | | | (5,992 | ) | | | | |
(5,065
|
)
|
| Net cash used in financing activities | | | | | | | | (15,680 | ) | | | | | (2,786 | ) |
|
Effect of exchange rates on cash
| | | | | | | | (215 | ) | | | | | 1,051 |
|
|
Net increase in cash, cash equivalents and restricted cash and cash
equivalents
| | | | | | | | (125,273 | ) | | | | |
2,022
| |
|
Cash, cash equivalents and restricted cash and cash equivalents at
beginning of period
| | | | | | | | 187,139 |
| | | | |
171,977
|
|
|
Cash, cash equivalents and restricted cash and cash equivalents at
end of period
| | | | | | | | $ | 61,866 |
| | | | |
$
|
173,999
|
|
| | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | |
|
|
|
|
| | | |
|
|
| | | |
HECLA MINING COMPANY
Production Data
|
| | | | | | | | | | | |
|
| | | |
Three Months Ended
|
|
|
|
|
Nine Months Ended
|
|
|
|
|
|
| September 30, 2018 |
|
|
| September 30,
2017
|
|
|
| September 30, 2018 |
|
|
| September 30,
2017
|
| GREENS CREEK UNIT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tons of ore milled
| | | | 213,037 | |
|
|
|
219,983
| | | | | 632,876 | |
|
|
|
627,900
| |
|
Mining cost per ton
| | | | $ | 68.76 | | | | |
$
|
69.46
| | | | | $ | 69.19 | | | | |
$
|
69.64
| |
|
Milling cost per ton
| | | | $ | 31.97 | | | | |
$
|
31.01
| | | | | $ | 32.73 | | | | |
$
|
32.38
| |
|
Ore grade milled - Silver (oz./ton)
| | | | 11.65 | | | | |
13.65
| | | | | 11.94 | | | | |
12.84
| |
|
Ore grade milled - Gold (oz./ton)
| | | | 0.087 | | | | |
0.089
| | | | | 0.094 | | | | |
0.095
| |
|
Ore grade milled - Lead (%)
| | | | 2.40 | | | | |
2.77
| | | | | 2.84 | | | | |
2.83
| |
|
Ore grade milled - Zinc (%)
| | | | 6.87 | | | | |
7.47
| | | | | 7.58 | | | | |
7.49
| |
|
Silver produced (oz.)
| | | | 1,876,417 | | | | |
2,344,315
| | | | | 5,789,440 | | | | |
6,205,659
| |
|
Gold produced (oz.)
| | | | 11,559 | | | | |
12,563
| | | | | 38,396 | | | | |
39,289
| |
|
Lead produced (tons)
| | | | 4,026 | | | | |
4,851
| | | | | 14,352 | | | | |
14,080
| |
|
Zinc produced (tons)
| | | | 12,695 | | | | |
14,325
| | | | | 41,673 | | | | |
40,697
| |
|
Cash cost, after by-product credits, per silver ounce (1) | | | | $ | 1.92 | | | | |
$
|
(0.15
|
)
| | | | $ | (2.22 | ) | | | |
$
|
0.73
| |
|
AISC, after by-product credits, per silver ounce (1) | | | | $ | 9.20 | | | | |
$
|
4.47
| | | | | $ | 4.71 | | | | |
$
|
5.60
| |
|
Capital additions (in thousands)
|
|
|
| $ | 11,029 |
|
|
|
|
$
|
8,206
|
|
|
|
| $ | 34,694 |
|
|
|
|
$
|
24,891
|
|
| LUCKY FRIDAY UNIT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tons of ore milled
| | | | 3,006 | | | | |
7,302
| | | | | 16,012 | | | | |
64,371
| |
|
Mining cost per ton
| | | | $ | — | | | | |
$
|
150.89
| | | | | $ | 87.79 | | | | |
$
|
112.60
| |
|
Milling cost per ton
| | | | $ | — | | | | |
$
|
13.15
| | | | | $ | 14.26 | | | | |
$
|
22.93
| |
|
Ore grade milled - Silver (oz./ton)
| | | | 11.41 | | | | |
12.87
| | | | | 11.06 | | | | |
12.45
| |
|
Ore grade milled - Lead (%)
| | | | 8.06 | | | | |
7.68
| | | | | 7.21 | | | | |
7.12
| |
|
Ore grade milled - Zinc (%)
| | | | 3.64 | | | | |
3.21
| | | | | 4.28 | | | | |
3.90
| |
|
Silver produced (oz.)
| | | | 31,639 | | | | |
88,298
| | | | | 156,015 | | | | |
769,080
| |
|
Lead produced (tons)
| | | | 212 | | | | |
518
| | | | | 1,035 | | | | |
4,346
| |
|
Zinc produced (tons)
| | | | 100 | | | | |
172
| | | | | 639 | | | | |
2,303
| |
|
Cash cost, after by-product credits, per silver ounce (1) | | | | N/A | | | | |
$
|
11.60
| | | | | N/A | | | | |
$
|
6.58
| |
|
AISC, after by-product credits, per silver ounce (1) | | | | N/A | | | | |
$
|
13.37
| | | | | N/A | | | | |
$
|
12.21
| |
|
Capital additions (in thousands)
|
|
|
| $ | 4,840 |
|
|
|
|
$
|
208
|
|
|
|
| $ | 6,889 |
|
|
|
|
$
|
5,000
|
|
| SAN SEBASTIAN |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tons of ore milled
| | | | 39,739 | | | | |
36,482
| | | | | 111,916 | | | | |
111,623
| |
|
Mining cost per ton
| | | | $ | 171.87 | | | | |
$
|
35.69
| | | | | $ | 157.21 | | | | |
$
|
38.70
| |
|
Milling cost per ton
| | | | $ | 65.98 | | | | |
$
|
69.42
| | | | | $ | 66.16 | | | | |
$
|
66.64
| |
|
Ore grade milled - Silver (oz./ton)
| | | | 14.16 | | | | |
25.48
| | | | | 15.36 | | | | |
23.71
| |
|
Ore grade milled - Gold (oz./ton)
| | | | 0.108 | | | | |
0.184
| | | | | 0.12 | | | | |
0.183
| |
|
Silver produced (oz.)
| | | | 521,931 | | | | |
880,885
| | | | | 1,593,770 | | | | |
2,498,638
| |
|
Gold produced (oz.)
| | | | 3,666 | | | | |
6,342
| | | | | 12,051 | | | | |
19,222
| |
|
Cash cost, after by-product credits, per silver ounce (1)
| | | | $ | 12.02 | | | | |
$
|
(3.12
|
)
| | | | $ | 8.28 | | | | |
$
|
(3.23
|
)
|
|
AISC, after by-product credits, per silver ounce (1)
| | | | $ | 16.95 | | | | |
$
|
(0.83
|
)
| | | | $ | 13.34 | | | | |
$
|
(0.14
|
)
|
|
Capital additions (in thousands)
|
|
|
| $ | 1,582 |
|
|
|
|
$
|
3,350
|
|
|
|
| $ | 3,692 |
|
|
|
|
$
|
7,480
|
|
| CASA BERARDI UNIT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tons of ore milled - underground
| | | | 181,285 | | | | |
206,209
| | | | | 556,991 | | | | |
606,201
| |
|
Tons of ore milled - surface pit
| | | | 172,555 | | | | |
119,936
| | | | | 495,335 | | | | |
343,745
| |
|
Tons of ore milled - total
| | | | 353,840 | | | | |
326,145
| | | | | 1,052,326 | | | | |
949,946
| |
|
Surface tons mined - ore and waste
| | | | 1,492,041 | | | | |
2,010,524
| | | | | 5,129,646 | | | | |
6,427,067
| |
|
Mining cost per ton of ore - underground
| | | | $ | 104.31 | | | | |
$
|
98.96
| | | | | $ | 102.56 | | | | |
$
|
98.71
| |
|
Mining cost per ton of ore - combined
| | | | $ | 65.97 | | | | |
$
|
82.95
| | | | | $ | 72.15 | | | | |
$
|
81.95
| |
|
Mining cost per ton of ore and waste - surface tons mined
| | | | $ | 4.10 | | | | |
$
|
3.42
| | | | | $ | 3.66 | | | | |
$
|
2.84
| |
|
Milling cost per ton
| | | | $ | 15.05 | | | | |
$
|
16.19
| | | | | $ | 15.91 | | | | |
$
|
16.28
| |
|
Ore grade milled - Gold (oz./ton) - underground
| | | | 0.229 | | | | |
0.193
| | | | | 0.204 | | | | |
0.167
| |
|
Ore grade milled - Gold (oz./ton) - surface pit
| | | | 0.050 | | | | |
0.084
| | | | | 0.064 | | | | |
0.086
| |
|
Ore grade milled - Gold (oz./ton) - combined
| | | | 0.140 | | | | |
0.153
| | | | | 0.138 | | | | |
0.137
| |
|
Ore grade milled - Silver (oz./ton)
| | | | 0.03 | | | | |
0.03
| | | | | 0.03 | | | | |
0.03
| |
|
Gold produced (oz.) - underground
| | | | 36,367 | | | | |
35,192
| | | | | 99,632 | | | | |
87,622
| |
|
Gold produced (oz.) - surface pit
| | | | 7,614 | | | | |
8,949
| | | | | 27,248 | | | | |
25,587
| |
|
Gold produced (oz.) - total
| | | | 43,981 | | | | |
44,141
| | | | | 126,880 | | | | |
113,209
| |
|
Cash cost, after by-product credits, per gold ounce (1) | | | | $ | 686 | | | | |
$
|
750
| | | | | $ | 760 | | | | |
$
|
858
| |
|
AISC, after by-product credits, per gold ounce (1) | | | | $ | 896 | | | | |
$
|
1,091
| | | | | $ | 1,004 | | | | |
$
|
1,226
| |
|
Capital additions (in thousands)
|
|
|
| $ | 8,244 |
|
|
|
|
$
|
13,775
|
|
|
|
| $ | 27,120 |
|
|
|
|
$
|
38,249
|
|
| Nevada Operations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tons of ore milled
| | | | 55,899 | | | | |
N/A
| | | | | 55,899 | | | | |
N/A
| |
|
Mining cost per ton
| | | | $ | 186.12 | | | | |
N/A
| | | | | $ | 186.12 | | | | |
N/A
| |
|
Milling cost per ton
| | | | $ | 70.39 | | | | |
N/A
| | | | | $ | 70.39 | | | | |
N/A
| |
|
Ore grade milled - Gold (oz./ton)
| | | | 0.288 | | | | |
N/A
| | | | | 0.288 | | | | |
N/A
| |
|
Silver produced (oz.)
| | | | 84,145 | | | | |
N/A
| | | | | 84,145 | | | | |
N/A
| |
|
Gold produced (oz.)
| | | | 13,789 | | | | |
N/A
| | | | | 13,789 | | | | |
N/A
| |
|
Cash cost, after by-product credits, per silver ounce (1) | | | | $ | 1,179 | | | | |
N/A
| | | | | $ | 1,179 | | | | |
N/A
| |
|
AISC, after by-product credits, per silver ounce (1) | | | | $ | 1,932 | | | | |
N/A
| | | | | $ | 1,932 | | | | |
N/A
| |
|
Capital additions (in thousands)
|
|
|
| $ | 14,998 |
|
|
|
|
N/A
|
|
|
|
| $ | 14,998 |
|
|
|
|
N/A
|
|
| | | | | | | | | | | | | | | | | | | | | |
|
|
(1)
|
|
|
Cash cost, after by-product credits, per ounce and AISC, after
by-product credits. per ounce represent non-U.S. Generally Accepted
Accounting Principles (GAAP) measurements. A reconciliation of cost
of sales and other direct production costs and depreciation,
depletion and amortization (GAAP) to cash cost, after by-product
credits can be found in the cash cost per ounce reconciliation
section of this news release. Gold, lead and zinc produced have been
treated as by-product credits in calculating silver costs per ounce.
The primary metal produced at Casa Berardi is gold, with a
by-product credit for the value of silver production.
|
| | |
|
Non-GAAP Measures
(Unaudited)
Reconciliation of Cost of Sales and Other Direct Production Costs
and Depreciation, Depletion and Amortization (GAAP) to Cash Cost, Before
By-product Credits and Cash Cost, After By-product Credits (non-GAAP)
and All-In Sustaining Cost, Before By-product Credits and All-In
Sustaining Cost, After By-product Credits (non-GAAP)
The tables below present reconciliations between the most comparable
GAAP measure of cost of sales and other direct production costs and
depreciation, depletion and amortization to the non-GAAP measures of
Cash Cost, Before By-product Credits, Cash Cost, After By-product
Credits, AISC, Before By-product Credits and AISC, After By-product
Credits for our operations at the Greens Creek, Lucky Friday, San
Sebastian, Casa Berardi and Nevada Operations units for the three- and
nine-month periods ended September 30, 2018 and 2017, and for estimated
results for the full year ended December 31, 2018.
Cash Cost, After By-product Credits, per Ounce is an important operating
statistic that we utilize to measure each mine's operating performance.
AISC, After By-product Credits, per Ounce is an important operating
statistic that we utilize as a measure of our mines' net cash flow after
costs for exploration, pre-development, reclamation, and sustaining
capital. Current GAAP measures used in the mining industry, such as cost
of goods sold, do not capture all the expenditures incurred to discover,
develop and sustain silver and gold production. Cash Cost, After
By-product Credits, per Ounce and AISC, After By-product Credits, per
Ounce also allow us to benchmark the performance of each of our mines
versus those of our competitors. As a silver and gold mining company, we
also use these statistics on an aggregate basis - aggregating the Greens
Creek, Lucky Friday and San Sebastian mines, to compare our performance
with that of other primary silver mining companies and aggregating Casa
Berardi and Nevada Operations for comparison with other gold mining
companies. Similarly, these statistics are useful in identifying
acquisition and investment opportunities as they provide a common tool
for measuring the financial performance of other mines with varying
geologic, metallurgical and operating characteristics.
Cash Cost, Before By-product Credits and AISC, Before By-product Credits
include all direct and indirect operating cash costs related directly to
the physical activities of producing metals, including mining,
processing and other plant costs, third-party refining expense, on-site
general and administrative costs, royalties and mining production taxes.
AISC, Before By-product Credits for each mine also includes on-site
exploration, reclamation, and sustaining capital costs. AISC, Before
By-product Credits for our consolidated silver properties also includes
corporate costs for general and administrative expense, reclamation,
exploration, and pre-development. By-product credits include revenues
earned from all metals other than the primary metal produced at each
unit. As depicted in the tables below, by-product credits comprise an
essential element of our silver unit cost structure, distinguishing our
silver operations due to the polymetallic nature of their orebodies.
Cash Cost, After By-product Credits, per Ounce and AISC, After
By-product Credits, per Ounce provide management and investors an
indication of operating cash flow, after consideration of the average
price, received from production. We also use these measurements for the
comparative monitoring of performance of our mining operations
period-to-period from a cash flow perspective. Cash Cost, After
By-product Credits, per Ounce is a measure developed by precious metals
companies (including the Silver Institute) in an effort to provide a
uniform standard for comparison purposes. There can be no assurance,
however, that our reporting of these non-GAAP measures are the same as
those reported by other mining companies.
The Casa Berardi and Nevada Operations sections below report Cash Cost,
After By-product Credits, per Gold Ounce and AISC, After By-product
Credits, per Gold Ounce for the production of gold, their primary
product, and by-product revenues earned from silver, which is a
by-product at Casa Berardi and Nevada Operations. Only costs and ounces
produced relating to units with the same primary product are combined to
represent Cash Cost, After By-product Credits, per Ounce and AISC, After
By-product Credits, per Ounce. Thus, the gold produced at our Casa
Berardi and Nevada Operations units are not included as a by-product
credit when calculating CashCost, After By-product
Credits, per Silver Ounce and AISC, After By-product Credits, per Silver
Ounce for the total of Greens Creek, Lucky Friday and San Sebastian, our
combined silver properties.
| In thousands (except per ounce amounts) |
|
|
|
Three Months Ended September 30, 2018 |
| | | |
Greens
Creek
|
|
|
|
Lucky
Friday(2) |
|
|
|
San
Sebastian
|
|
|
|
Corporate(3) |
|
|
|
Total Silver
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
52,163
| | | | |
(1
|
)
| | | |
$
|
14,325
| | | | | | | | |
$
|
66,487
| |
|
Depreciation, depletion and amortization
| | | |
(12,428
|
)
| | | |
—
| | | | |
(1,795
|
)
| | | | | | | |
(14,223
|
)
|
|
Treatment costs
| | | |
8,267
| | | | |
134
| | | | |
205
| | | | | | | | |
8,606
| |
|
Change in product inventory
| | | |
(4,480
|
)
| | | |
—
| | | | |
(1,549
|
)
| | | | | | | |
(6,029
|
)
|
|
Reclamation and other costs
| | | |
(965
|
)
| | | |
103
| | | | |
(458
|
)
| | | | | | | |
(1,320
|
)
|
|
Exclusion of Lucky Friday costs
| | | |
—
|
| | | |
(236
|
)
| | | |
—
|
| | | | | | | |
(236
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
42,557
| | | | |
—
| | | | |
10,728
| | | | | | | | |
53,285
| |
|
Reclamation and other costs
| | | |
849
| | | | |
—
| | | | |
105
| | | | | | | | |
954
| |
|
Exploration
| | | |
1,771
| | | | |
—
| | | | |
1,982
| | | | |
473
| | | | |
4,226
| |
|
Sustaining capital
| | | |
11,029
| | | | |
—
| | | | |
486
| | | | |
704
| | | | |
12,219
| |
|
General and administrative
| | | |
| | | |
| | | |
| | | |
10,327
| | | | |
10,327
|
|
AISC, Before By-product Credits(1) | | | |
56,206
| | | | |
—
| | | | |
13,301
| | | | | | | | |
81,011
| |
|
By-product credits:
| | | | | | | | | | | | | | | | | | | | |
|
Zinc
| | | |
(20,674
|
)
| | | |
—
| | | | | | | | | | | | |
(20,674
|
)
|
|
Gold
| | | |
(12,229
|
)
| | | |
—
| | | | |
(4,450
|
)
| | | | | | | |
(16,679
|
)
|
|
Lead
| | | |
(6,041
|
)
| | | |
—
|
| | | |
| | | | | | | |
(6,041
|
)
|
|
Total By-product credits
| | | |
(38,944
|
)
| | | |
—
|
| | | |
(4,450
|
)
| | | | | | | |
(43,394
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
3,613
|
| | | |
$
|
—
|
| | | |
$
|
6,278
|
| | | | | | | |
$
|
9,891
|
|
|
AISC, After By-product Credits
| | | |
$
|
17,262
|
| | | |
$
|
—
|
| | | |
$
|
8,851
|
| | | | | | | |
$
|
37,617
|
|
|
Divided by ounces produced
| | | |
1,876
| | | | |
—
| | | | |
522
| | | | | | | | |
2,398
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
22.67
| | | | |
N/A
| | | |
$
|
20.55
| | | | | | | | |
$
|
22.22
| |
|
By-product credits per ounce
| | | |
(20.75
|
)
| | | |
N/A
| | | |
(8.53
|
)
| | | | | | | |
(18.10
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
1.92
|
| | | |
N/A
| | | |
$
|
12.02
|
| | | | | | | |
$
|
4.12
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
29.95
| | | | |
N/A
| | | |
$
|
25.48
| | | | | | | | |
$
|
33.78
| |
|
By-product credits per ounce
| | | |
(20.75
|
)
| | | |
N/A
| | | |
(8.53
|
)
| | | | | | | |
(18.10
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
9.20
|
| | | |
N/A
| | | |
$
|
16.95
|
| | | | | | | |
$
|
15.68
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Three Months Ended September 30, 2018
|
| | | | Casa Berardi |
|
|
|
Nevada Ops(4) |
|
|
|
Total Gold
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
51,267
| | | | |
$
|
19,319
| | | | |
$
|
70,586
| |
|
Depreciation, depletion and amortization
| | | |
(20,054
|
)
| | | |
(9,187
|
)
| | | |
(29,241
|
)
|
|
Treatment costs
| | | |
535
| | | | |
42
| | | | |
577
| |
|
Change in product inventory
| | | |
(1,303
|
)
| | | |
7,311
| | | | |
6,008
| |
|
Reclamation and other costs
| | | |
(140
|
)
| | | |
—
|
| | | |
(140
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
30,305
| | | | |
17,485
| | | | |
47,790
| |
|
Reclamation and other costs
| | | |
138
| | | | |
—
| | | | |
138
| |
|
Exploration
| | | |
854
| | | | |
3,322
| | | | |
4,176
| |
|
Sustaining capital
| | | |
8,244
| | | | |
7,061
| | | | |
15,305
| |
|
General and administrative
| | | |
—
|
| | | |
—
|
| | | |
—
|
|
AISC, Before By-product Credits(1) | | | |
39,541
| | | | |
27,868
| | | | |
67,409
| |
|
By-product credits:
| | | | | | | | | | | | |
|
Silver
| | | |
(142
|
)
| | | |
(1,232
|
)
| | | |
(1,374
|
)
|
|
Total By-product credits
| | | |
(142
|
)
| | | |
(1,232
|
)
| | | |
(1,374
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
30,163
|
| | | |
$
|
16,253
|
| | | |
$
|
46,416
|
|
|
AISC, After By-product Credits
| | | |
$
|
39,399
|
| | | |
$
|
26,636
|
| | | |
$
|
66,035
|
|
|
Divided by ounces produced
| | | |
44
| | | | |
14
| | | | |
58
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
689
| | | | |
$
|
1,268
| | | | |
$
|
827
| |
|
By-product credits per ounce
| | | |
(3
|
)
| | | |
(89
|
)
| | | |
(24
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
686
|
| | | |
$
|
1,179
|
| | | |
$
|
803
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
899
| | | | |
$
|
2,021
| | | | |
$
|
1,167
| |
|
By-product credits per ounce
| | | |
(3
|
)
| | | |
(89
|
)
| | | |
(24
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
896
|
| | | |
$
|
1,932
|
| | | |
$
|
1,143
|
|
| | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Three Months Ended September 30, 2018
|
| | | |
Total Silver
|
|
|
|
Total Gold
|
|
|
|
Total
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
66,487
| | | | |
$
|
70,586
| | | | |
$
|
137,073
| |
|
Depreciation, depletion and amortization
| | | |
(14,223
|
)
| | | |
(29,241
|
)
| | | |
(43,464
|
)
|
|
Treatment costs
| | | |
8,606
| | | | |
577
| | | | |
9,183
| |
|
Change in product inventory
| | | |
(6,029
|
)
| | | |
6,008
| | | | |
(21
|
)
|
|
Reclamation and other costs
| | | |
(1,320
|
)
| | | |
(140
|
)
| | | |
(1,460
|
)
|
|
Exclusion of Lucky Friday costs
| | | |
(236
|
)
| | | |
| | | |
(236
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
53,285
| | | | |
47,790
| | | | |
101,075
| |
|
Reclamation and other costs
| | | |
954
| | | | |
138
| | | | |
1,092
| |
|
Exploration
| | | |
4,226
| | | | |
4,176
| | | | |
8,402
| |
|
Sustaining capital
| | | |
12,219
| | | | |
15,305
| | | | |
27,524
| |
|
General and administrative
| | | |
10,327
|
| | | |
—
|
| | | |
10,327
|
|
AISC, Before By-product Credits(1) | | | |
81,011
| | | | |
67,409
| | | | |
148,420
| |
|
By-product credits:
| | | | | | | | | | | | |
|
Zinc
| | | |
(20,674
|
)
| | | | | | | |
(20,674
|
)
|
|
Gold
| | | |
(16,679
|
)
| | | | | | | |
(16,679
|
)
|
|
Lead
| | | |
(6,041
|
)
| | | | | | | |
(6,041
|
)
|
|
Silver
| | | |
| | | |
(1,374
|
)
| | | |
(1,374
|
)
|
|
Total By-product credits
| | | |
(43,394
|
)
| | | |
(1,374
|
)
| | | |
(44,768
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
9,891
|
| | | |
$
|
46,416
|
| | | |
$
|
56,307
|
|
|
AISC, After By-product Credits
| | | |
$
|
37,617
|
| | | |
$
|
66,035
|
| | | |
$
|
103,652
|
|
|
Divided by ounces produced
| | | |
2,398
| | | | |
58
| | | | | |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
22.22
| | | | |
$
|
827
| | | | | |
|
By-product credits per ounce
| | | |
(18.10
|
)
| | | |
(24
|
)
| | | | |
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
4.12
|
| | | |
$
|
803
|
| | | | |
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
33.78
| | | | |
$
|
1,167
| | | | | |
|
By-product credits per ounce
| | | |
(18.10
|
)
| | | |
(24
|
)
| | | | |
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
15.68
|
| | | |
$
|
1,143
|
| | | | |
| | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Nine Months Ended September 30, 2018
|
| | | |
Greens
Creek
|
|
|
|
Lucky
Friday(2) |
|
|
|
San
Sebastian
|
|
|
|
Corporate(3) |
|
|
|
Total Silver
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
141,763
| | | | |
$
|
5,844
| | | | |
$
|
31,177
| | | | | | | | |
$
|
178,784
| |
|
Depreciation, depletion and amortization
| | | |
(34,880
|
)
| | | |
(803
|
)
| | | |
(3,586
|
)
| | | | | | | |
(39,269
|
)
|
|
Treatment costs
| | | |
29,136
| | | | |
761
| | | | |
627
| | | | | | | | |
30,524
| |
|
Change in product inventory
| | | |
995
| | | | |
(2,182
|
)
| | | |
1,858
| | | | | | | | |
671
| |
|
Reclamation and other costs
| | | |
(2,323
|
)
| | | |
—
| | | | |
(1,374
|
)
| | | | | | | |
(3,697
|
)
|
|
Exclusion of Lucky Friday costs
| | | |
—
|
| | | |
(3,620
|
)
| | | |
—
|
| | | | | | | |
(3,620
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
134,691
| | | | |
—
| | | | |
28,702
| | | | | | | | |
163,393
| |
|
Reclamation and other costs
| | | |
2,548
| | | | |
—
| | | | |
314
| | | | | | | | |
2,862
| |
|
Exploration
| | | |
2,909
| | | | |
—
| | | | |
6,628
| | | | |
1,351
| | | | |
10,888
| |
|
Sustaining capital
| | | |
34,694
| | | | |
—
| | | | |
1,119
| | | | |
1,338
| | | | |
37,151
| |
|
General and administrative
| | | |
| | | |
|
| | | |
| | | |
27,849
| | | | |
27,849
|
|
AISC, Before By-product Credits(1) | | | |
174,842
| | | | |
—
| | | | |
36,763
| | | | | | | | |
242,143
| |
|
By-product credits:
| | | | | | | | | | | | | | | | | | | | | |
|
Zinc
| | | |
(80,308
|
)
| | | |
—
| | | | | | | | | | | | |
(80,308
|
)
|
|
Gold
| | | |
(43,237
|
)
| | | | | | | | |
(15,505
|
)
| | | | | | | |
(58,742
|
)
|
|
Lead
| | | |
(24,037
|
)
| | | |
—
|
| | | |
| | | | | | | |
(24,037
|
)
|
|
Total By-product credits
| | | |
(147,582
|
)
| | | |
—
|
| | | |
(15,505
|
)
| | | | | | | |
(163,087
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
(12,891
|
)
| | | |
$
|
—
|
| | | |
$
|
13,197
|
| | | | | | | |
$
|
306
|
|
|
AISC, After By-product Credits
| | | |
$
|
27,260
|
| | | |
$
|
—
|
| | | |
$
|
21,258
|
| | | | | | | |
$
|
79,056
|
|
|
Divided by ounces produced
| | | |
5,789
| | | | |
—
| | | | |
1,594
| | | | | | | | |
7,383
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
23.27
| | | | |
N/A
| | | | |
$
|
18.01
| | | | | | | | |
$
|
22.14
| |
|
By-product credits per ounce
| | | |
(25.49
|
)
| | | |
N/A
|
| | | |
(9.73
|
)
| | | | | | | |
(22.09
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
(2.22
|
)
| | | |
N/A
|
| | | |
$
|
8.28
|
| | | | | | | |
$
|
0.05
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
30.20
| | | | |
N/A
| | | | |
$
|
23.07
| | | | | | | | |
$
|
32.80
| |
|
By-product credits per ounce
| | | |
(25.49
|
)
| | | |
N/A
|
| | | |
(9.73
|
)
| | | | | | | |
(22.09
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
4.71
|
| | | |
N/A
|
| | | |
$
|
13.34
|
| | | | | | | |
$
|
10.71
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Nine Months Ended September 30, 2018
|
| | | | Casa Berardi |
|
|
|
Nevada Ops(4) |
|
|
|
Total Gold
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
152,150
| | | | |
$
|
19,319
| | | | |
$
|
171,469
| |
|
Depreciation, depletion and amortization
| | | |
(54,879
|
)
| | | |
(9,187
|
)
| | | |
(64,066
|
)
|
|
Treatment costs
| | | |
1,628
| | | | |
42
| | | | |
1,670
| |
|
Change in product inventory
| | | |
(1,482
|
)
| | | |
7,311
| | | | |
5,829
| |
|
Reclamation and other costs
| | | |
(421
|
)
| | | |
—
|
| | | |
(421
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
96,996
| | | | |
17,485
| | | | |
114,481
| |
|
Reclamation and other costs
| | | |
421
| | | | |
—
| | | | |
421
| |
|
Exploration
| | | |
3,374
| | | | |
3,322
| | | | |
6,696
| |
|
Sustaining capital
| | | |
27,120
| | | | |
7,061
| | | | |
34,181
| |
|
General and administrative
| | | |
—
|
| | | |
—
|
| | | |
—
|
|
AISC, Before By-product Credits(1) | | | |
127,911
| | | | |
27,868
| | | | |
155,779
| |
|
By-product credits:
| | | | | | | | | | | | |
|
Silver
| | | |
(491
|
)
| | | |
(1,232
|
)
| | | |
(1,723
|
)
|
|
Total By-product credits
| | | |
(491
|
)
| | | |
(1,232
|
)
| | | |
(1,723
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
96,505
|
| | | |
$
|
16,253
|
| | | |
$
|
112,758
|
|
|
AISC, After By-product Credits
| | | |
$
|
127,420
|
| | | |
$
|
26,636
|
| | | |
$
|
154,056
|
|
|
Divided by ounces produced
| | | |
127
| | | | |
14
| | | | |
141
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
764
| | | | |
$
|
1,268
| | | | |
$
|
814
| |
|
By-product credits per ounce
| | | |
(4
|
)
| | | |
(89
|
)
| | | |
(12
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
760
|
| | | |
$
|
1,179
|
| | | |
$
|
802
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
1,008
| | | | |
$
|
2,021
| | | | |
$
|
1,107
| |
|
By-product credits per ounce
| | | |
(4
|
)
| | | |
(89
|
)
| | | |
(12
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
1,004
|
| | | |
$
|
1,932
|
| | | |
$
|
1,095
|
|
| | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Nine Months Ended September 30, 2018
|
| | | |
Total Silver
|
|
|
|
Total Gold
|
|
|
|
Total
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
178,784
| | | | |
$
|
171,469
| | | | |
$
|
350,253
| |
|
Depreciation, depletion and amortization
| | | |
(39,269
|
)
| | | |
(64,066
|
)
| | | |
(103,335
|
)
|
|
Treatment costs
| | | |
30,524
| | | | |
1,670
| | | | |
32,194
| |
|
Change in product inventory
| | | |
671
| | | | |
5,829
| | | | |
6,500
| |
|
Reclamation and other costs
| | | |
(3,697
|
)
| | | |
(421
|
)
| | | |
(4,118
|
)
|
|
Exclusion of Lucky Friday costs
| | | |
(3,620
|
)
| | | |
—
|
| | | |
(3,620
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
163,393
| | | | |
114,481
| | | | |
277,874
| |
|
Reclamation and other costs
| | | |
2,862
| | | | |
421
| | | | |
3,283
| |
|
Exploration
| | | |
10,888
| | | | |
6,696
| | | | |
17,584
| |
|
Sustaining capital
| | | |
37,151
| | | | |
34,181
| | | | |
71,332
| |
|
General and administrative
| | | |
27,849
|
| | | |
—
|
| | | |
27,849
|
|
AISC, Before By-product Credits(1) | | | |
242,143
| | | | |
155,779
| | | | |
397,922
| |
|
By-product credits:
| | | | | | | | | | | | |
|
Zinc
| | | |
(80,308
|
)
| | | | | | | |
(80,308
|
)
|
|
Gold
| | | |
(58,742
|
)
| | | | | | | |
(58,742
|
)
|
|
Lead
| | | |
(24,037
|
)
| | | | | | | |
(24,037
|
)
|
|
Silver
| | | |
| | | |
(1,723
|
)
| | | |
(1,723
|
)
|
Total By-product credits
| | | |
(163,087
|
)
| | | |
(1,723
|
)
| | | |
(164,810
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
306
|
| | | |
$
|
112,758
|
| | | |
$
|
113,064
|
|
|
AISC, After By-product Credits
| | | |
$
|
79,056
|
| | | |
$
|
154,056
|
| | | |
$
|
233,112
|
|
|
Divided by ounces produced
| | | |
7,383
| | | | |
141
| | | | | |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
22.14
| | | | |
$
|
814
| | | | | |
|
By-product credits per ounce
| | | |
(22.09
|
)
| | | |
(12
|
)
| | | | |
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
0.05
|
| | | |
$
|
802
|
| | | | |
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
32.80
| | | | |
$
|
1,107
| | | | | |
|
By-product credits per ounce
| | | |
(22.09
|
)
| | | |
(12
|
)
| | | | |
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
10.71
|
| | | |
$
|
1,095
|
| | | | |
| | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Three Months Ended September 30, 2017
|
| | | |
Greens
Creek
|
|
|
|
Lucky
Friday(2) |
|
|
|
San
Sebastian
|
|
|
|
Corporate(3) |
|
|
|
Total Silver
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
41,927
| | | | |
$
|
—
| | | | |
$
|
6,680
| | | | | | | | |
$
|
48,607
| |
|
Depreciation, depletion and amortization
| | | |
(12,607
|
)
| | | |
—
| | | | |
(641
|
)
| | | | | | | |
(13,248
|
)
|
|
Treatment costs
| | | |
12,067
| | | | |
440
| | | | |
422
| | | | | | | | |
12,929
| |
|
Change in product inventory
| | | |
7,675
| | | | |
1,960
| | | | |
(627
|
)
| | | | | | | |
9,008
| |
|
Reclamation and other costs
| | | |
(394
|
)
| | | |
18
|
| | | |
(494
|
)
| | | | | | | |
(870
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
48,668
| | | | |
2,418
| | | | |
5,340
| | | | | | | | |
56,426
| |
|
Reclamation and other costs
| | | |
666
| | | | |
38
| | | | |
117
| | | | | | | | |
821
| |
|
Exploration
| | | |
1,944
| | | | |
(2
|
)
| | | |
1,495
| | | | |
477
| | | | |
3,914
| |
|
Sustaining capital
| | | |
8,210
| | | | |
119
| | | | |
402
| | | | |
1,105
| | | | |
9,836
| |
|
General and administrative
| | | |
| | | |
| | | |
| | | |
9,529
| | | | |
9,529
|
|
AISC, Before By-product Credits(1) | | | |
59,488
| | | | |
2,573
| | | | |
7,354
| | | | | | | | |
80,526
| |
|
By-product credits:
| | | | | | | | | | | | | | | | | | | | |
|
Zinc
| | | |
(27,046
|
)
| | | |
(293
|
)
| | | | | | | | | | | |
(27,339
|
)
|
|
Gold
| | | |
(13,907
|
)
| | | |
—
| | | | |
(8,088
|
)
| | | | | | | |
(21,995
|
)
|
|
Lead
| | | |
(8,067
|
)
| | | |
(1,102
|
)
| | | |
| | | | | | | |
(9,169
|
)
|
|
Total By-product credits
| | | |
(49,020
|
)
| | | |
(1,395
|
)
| | | |
(8,088
|
)
| | | | | | | |
(58,503
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
(352
|
)
| | | |
$
|
1,023
|
| | | |
$
|
(2,748
|
)
| | | | | | | |
$
|
(2,077
|
)
|
|
AISC, After By-product Credits
| | | |
$
|
10,468
|
| | | |
$
|
1,178
|
| | | |
$
|
(734
|
)
| | | | | | | |
$
|
22,023
|
|
|
Divided by ounces produced
| | | |
2,344
| | | | |
88
| | | | |
880
| | | | | | | | |
3,312
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
20.75
| | | | |
$
|
27.44
| | | | |
$
|
6.07
| | | | | | | | |
$
|
17.03
| |
|
By-product credits per ounce
| | | |
(20.90
|
)
| | | |
(15.84
|
)
| | | |
(9.19
|
)
| | | | | | | |
(17.66
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
(0.15
|
)
| | | |
$
|
11.60
|
| | | |
$
|
(3.12
|
)
| | | | | | | |
$
|
(0.63
|
)
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
25.37
| | | | |
$
|
29.21
| | | | |
$
|
8.36
| | | | | | | | |
$
|
24.31
| |
|
By-product credits per ounce
| | | |
(20.90
|
)
| | | |
(15.84
|
)
| | | |
(9.19
|
)
| | | | | | | |
(17.66
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
4.47
|
| | | |
$
|
13.37
|
| | | |
$
|
(0.83
|
)
| | | | | | | |
$
|
6.65
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Three Months Ended September 30, 2017
|
| | | | Casa Berardi |
|
|
|
Nevada Ops(4) |
|
|
|
Total Gold
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
49,269
| | | | |
N/A
| | | | |
$
|
49,269
| |
|
Depreciation, depletion and amortization
| | | |
(16,270
|
)
| | | |
N/A
| | | | |
(16,270
|
)
|
|
Treatment costs
| | | |
682
| | | | |
N/A
| | | | |
682
| |
|
Change in product inventory
| | | |
(288
|
)
| | | |
N/A
| | | | |
(288
|
)
|
|
Reclamation and other costs
| | | |
(124
|
)
| | | |
N/A
|
| | | |
(124
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
33,269
| | | | |
—
| | | | |
33,269
| |
|
Reclamation and other costs
| | | |
123
| | | | |
N/A
| | | | |
123
| |
|
Exploration
| | | |
1,161
| | | | |
N/A
| | | | |
1,161
| |
|
Sustaining capital
| | | |
13,775
| | | | |
N/A
| | | | |
13,775
| |
|
General and administrative
| | | |
—
|
| | | |
N/A
|
| | | |
—
|
|
AISC, Before By-product Credits(1) | | | |
48,328
| | | | |
—
| | | | |
48,328
| |
|
By-product credits:
| | | | | | | | | | | | | |
|
Silver
| | | |
(161
|
)
| | | |
N/A
|
| | | |
(161
|
)
|
|
Total By-product credits
| | | |
(161
|
)
| | | |
N/A
|
| | | |
(161
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
33,108
|
| | | |
N/A
|
| | | |
$
|
33,108
|
|
|
AISC, After By-product Credits
| | | |
$
|
48,167
|
| | | |
N/A
|
| | | |
$
|
48,167
|
|
|
Divided by ounces produced
| | | |
44
| | | | |
N/A
| | | | |
44
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
754
| | | | |
N/A
| | | | |
$
|
754
| |
|
By-product credits per ounce
| | | |
(4
|
)
| | | |
N/A
|
| | | |
(4
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
750
|
| | | |
N/A
|
| | | |
$
|
750
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
1,095
| | | | |
N/A
| | | | |
$
|
1,095
| |
|
By-product credits per ounce
| | | |
(4
|
)
| | | |
N/A
|
| | | |
(4
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
1,091
|
| | | |
N/A
|
| | | |
$
|
1,091
|
|
| | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Nine Months Ended September 30, 2017
|
| | | |
Greens
Creek
|
|
|
|
Lucky
Friday(2) |
|
|
|
San
Sebastian
|
|
|
|
Corporate(3) |
|
|
|
Total Silver
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
140,241
| | | | |
$
|
14,542
| | | | |
$
|
18,377
| | | | | | | | |
$
|
173,160
| |
|
Depreciation, depletion and amortization
| | | |
(39,442
|
)
| | | |
(2,433
|
)
| | | |
(2,036
|
)
| | | | | | | |
(43,911
|
)
|
|
Treatment costs
| | | |
37,621
| | | | |
4,257
| | | | |
906
| | | | | | | | |
42,784
| |
|
Change in product inventory
| | | |
5,398
| | | | |
1,811
| | | | |
(192
|
)
| | | | | | | |
7,017
| |
|
Reclamation and other costs
| | | |
(1,474
|
)
| | | |
(163
|
)
| | | |
(1,089
|
)
| | | | | | | |
(2,726
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
142,344
| | | | |
18,014
| | | | |
15,966
| | | | | | | | |
176,324
| |
|
Reclamation and other costs
| | | |
1,999
| | | | |
217
| | | | |
351
| | | | | | | | |
2,567
| |
|
Exploration
| | | |
3,339
| | | | |
(1
|
)
| | | |
4,984
| | | | |
1,307
| | | | |
9,629
| |
|
Sustaining capital
| | | |
24,895
| | | | |
4,109
| | | | |
2,379
| | | | |
2,275
| | | | |
33,658
| |
|
General and administrative
| | | |
| | | |
| | | |
| | | |
29,044
| | | | |
29,044
|
|
AISC, Before By-product Credits(1) | | | |
172,577
| | | | |
22,339
| | | | |
23,680
| | | | | | | | |
251,222
| |
|
By-product credits:
| | | | | | | | | | | | | | | | | | | | |
|
Zinc
| | | |
(72,472
|
)
| | | |
(4,353
|
)
| | | | | | | | | | | |
(76,825
|
)
|
|
Gold
| | | |
(42,675
|
)
| | | | | | | |
(24,032
|
)
| | | | | | | |
(66,707
|
)
|
|
Lead
| | | |
(22,696
|
)
| | | |
(8,599
|
)
| | | |
| | | | | | | |
(31,295
|
)
|
Total By-product credits
| | | |
(137,843
|
)
| | | |
(12,952
|
)
| | | |
(24,032
|
)
| | | | | | | |
(174,827
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
4,501
|
| | | |
$
|
5,062
|
| | | |
$
|
(8,066
|
)
| | | | | | | |
$
|
1,497
|
|
|
AISC, After By-product Credits
| | | |
$
|
34,734
|
| | | |
$
|
9,387
|
| | | |
$
|
(352
|
)
| | | | | | | |
$
|
76,395
|
|
|
Divided by ounces produced
| | | |
6,206
| | | | |
769
| | | | |
2,498
| | | | | | | | |
9,473
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
22.94
| | | | |
$
|
23.42
| | | | |
$
|
6.39
| | | | | | | | |
$
|
18.62
| |
|
By-product credits per ounce
| | | |
(22.21
|
)
| | | |
(16.84
|
)
| | | |
(9.62
|
)
| | | | | | | |
(18.46
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
0.73
|
| | | |
$
|
6.58
|
| | | |
$
|
(3.23
|
)
| | | | | | | |
$
|
0.16
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
27.81
| | | | |
$
|
29.05
| | | | |
$
|
9.48
| | | | | | | | |
$
|
26.52
| |
|
By-product credits per ounce
| | | |
(22.21
|
)
| | | |
(16.84
|
)
| | | |
(9.62
|
)
| | | | | | | |
(18.46
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
5.60
|
| | | |
$
|
12.21
|
| | | |
$
|
(0.14
|
)
| | | | | | | |
$
|
8.06
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Nine Months Ended September 30, 2017
|
| | | | Casa Berardi (Gold)
|
|
|
|
Nevada Ops(4) |
|
|
|
Total Gold
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
138,363
| | | | |
N/A
| | | | |
$
|
138,363
| |
|
Depreciation, depletion and amortization
| | | |
(43,075
|
)
| | | |
N/A
| | | | |
(43,075
|
)
|
|
Treatment costs
| | | |
1,774
| | | | |
N/A
| | | | |
1,774
| |
|
Change in product inventory
| | | |
881
| | | | |
N/A
| | | | |
881
| |
|
Reclamation and other costs
| | | |
(354
|
)
| | | |
N/A
|
| | | |
(354
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
97,589
| | | | |
—
| | | | |
97,589
| |
|
Reclamation and other costs
| | | |
353
| | | | |
N/A
| | | | |
353
| |
|
Exploration
| | | |
3,029
| | | | |
N/A
| | | | |
3,029
| |
|
Sustaining capital
| | | |
38,245
| | | | |
N/A
| | | | |
38,245
| |
|
General and administrative
| | | |
| | | |
N/A
|
| | | |
|
AISC, Before By-product Credits(1) | | | |
139,216
| | | | |
—
| | | | |
139,216
| |
|
By-product credits:
| | | | | | | | | | | | | |
|
Silver
| | | |
(450
|
)
| | | |
N/A
|
| | | |
(450
|
)
|
|
Total By-product credits
| | | |
(450
|
)
| | | |
N/A
|
| | | |
(450
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
97,139
|
| | | |
N/A
|
| | | |
$
|
97,139
|
|
|
AISC, After By-product Credits
| | | |
$
|
138,766
|
| | | |
N/A
|
| | | |
$
|
138,766
|
|
|
Divided by ounces produced
| | | |
113
| | | | |
N/A
| | | | |
113
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
862
| | | | |
N/A
| | | | |
$
|
862
| |
|
By-product credits per ounce
| | | |
(4
|
)
| | | |
N/A
|
| | | |
(4
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
858
|
| | | |
N/A
|
| | | |
$
|
858
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
1,230
| | | | |
N/A
| | | | |
$
|
1,230
| |
|
By-product credits per ounce
| | | |
(4
|
)
| | | |
N/A
|
| | | |
(4
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
1,226
|
| | | |
N/A
|
| | | |
$
|
1,226
|
|
| | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Estimate for the Twelve Months Ended December 31, 2018
|
| | | |
Greens
Creek
|
|
|
Lucky
Friday(2) |
|
|
San
Sebastian
|
|
|
Corporate(3) |
|
|
Total
Silver
|
|
|
Casa
Berardi
(Gold)
|
|
| Nevada
Ops(4) |
|
|
Total Gold
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
183,000
| | | | | | |
$
|
42,000
| | | | | | |
$
|
225,000
| | | |
$
|
203,000
| | | |
$
|
64,000
| | | |
$
|
267,000
| |
|
Depreciation, depletion and amortization
| | | |
(44,000
|
)
| | | | | |
(5,000
|
)
| | | | | |
(49,000
|
)
| | |
(72,000
|
)
| | |
(14,000
|
)
| | |
(86,000
|
)
|
|
Treatment costs
| | | |
38,000
| | | | | | |
1,000
| | | | | | |
39,000
| | | |
2,000
| | | |
—
| | | |
2,000
| |
|
Change in product inventory
| | | |
4,000
| | | | | | |
2,000
| | | | | | |
6,000
| | | |
(2,000
|
)
| | |
—
| | | |
(2,000
|
)
|
|
Reclamation and other costs
| | | |
| | |
| | |
(1,000
|
)
| | | | | |
(1,000
|
)
| | |
(1,000
|
)
| | |
—
|
| | |
(1,000
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
181,000
| | | | | | |
39,000
| | | | | | |
220,000
| | | |
130,000
| | | |
50,000
| | | |
180,000
| |
|
Reclamation and other costs
| | | |
3,000
| | | | | | |
1,000
| | | | | | |
4,000
| | | |
—
| | | |
—
| | | |
—
| |
|
Exploration
| | | |
3,000
| | | | | | |
7,000
| | | |
2,500
| | | |
12,500
| | | |
5,000
| | | |
7,000
| | | |
12,000
| |
|
Sustaining capital
| | | |
52,000
| | | | | | |
3,000
| | | |
2,000
| | | |
57,000
| | | |
43,000
| | | |
16,000
| | | |
59,000
| |
|
General and administrative
| | | |
| | |
| | |
| | |
35,000
| | | |
35,000
|
| | |
| | |
| | |
|
AISC, Before By-product Credits(1) | | | |
239,000
| | | | | | |
50,000
| | | | | | |
328,500
| | | |
178,000
| | | |
73,000
| | | |
251,000
| |
|
By-product credits:
| | | |
(193,000
|
)
| | | | | |
(20,000
|
)
| | | | | |
(213,000
|
)
| | |
(600
|
)
| | |
(3,500
|
)
| | |
(4,100
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
(12,000
|
)
| | |
| | |
$
|
19,000
|
| | | | | |
$
|
7,000
|
| | |
$
|
129,400
|
| | |
$
|
46,500
|
| | |
$
|
175,900
|
|
|
AISC, After By-product Credits
| | | |
$
|
46,000
|
| | |
| | |
$
|
30,000
|
| | | | | |
$
|
115,500
|
| | |
$
|
177,400
|
| | |
$
|
69,500
|
| | |
$
|
246,900
|
|
|
Divided by ounces produced
| | | |
7,641
| | | | | | |
2,038
| | | | | | |
9,679
| | | |
165
| | | |
37
| | | |
202
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
23.69
| | | | | | |
$
|
19.14
| | | | | | |
$
|
22.73
| | | |
$
|
788
| | | |
$
|
1,351
| | | |
$
|
891
| |
|
By-product credits per ounce
| | | |
(25.26
|
)
| | |
| | |
(9.81
|
)
| | | | | |
(22.01
|
)
| | |
(4
|
)
| | |
(95
|
)
| | |
(20
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
(1.57
|
)
| | |
| | |
$
|
9.33
|
| | | | | |
$
|
0.72
|
| | |
$
|
784
|
| | |
$
|
1,256
|
| | |
$
|
871
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
31.28
| | | | | | |
$
|
24.53
| | | | | | |
$
|
33.94
| | | |
$
|
1,079
| | | |
$
|
1,973
| | | |
$
|
1,243
| |
|
By-product credits per ounce
| | | |
(25.26
|
)
| | |
| | |
(9.81
|
)
| | | | | |
(22.01
|
)
| | |
(4
|
)
| | |
(95
|
)
| | |
(20
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
6.02
|
| | |
| | |
$
|
14.72
|
| | | | | |
$
|
11.93
|
| | |
$
|
1,075
|
| | |
$
|
1,878
|
| | |
$
|
1,223
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
| In thousands (except per ounce amounts) |
|
|
|
Original Estimate for Twelve Months Ended December 31, 2018
|
| | | |
Greens
Creek
|
|
|
Lucky
Friday(2) |
|
|
San
Sebastian
|
|
|
Corporate(3) |
|
|
Total
Silver
|
|
|
Casa
Berardi
(Gold)
|
|
| Nevada
Ops(4) |
|
|
Total Gold
|
|
Cost of sales and other direct production costs and depreciation,
depletion and amortization
| | | |
$
|
198,000
| | | | | | |
$
|
44,000
| | | | | | |
$
|
242,000
| | | |
$
|
185,000
| | | |
$
|
68,000
| | | |
$
|
253,000
| |
|
Depreciation, depletion and amortization
| | | |
(50,000
|
)
| | | | | |
(6,000
|
)
| | | | | |
(56,000
|
)
| | |
(58,000
|
)
| | |
(16,000
|
)
| | |
(74,000
|
)
|
|
Treatment costs
| | | |
44,000
| | | | | | |
550
| | | | | | |
44,550
| | | |
400
| | | |
—
| | | |
400
| |
|
Change in product inventory
| | | |
—
| | | | | | |
(1,000
|
)
| | | | | |
(1,000
|
)
| | |
—
| | | |
(14,000
|
)
| | |
(14,000
|
)
|
|
Reclamation and other costs
| | | |
(2,900
|
)
| | |
| | |
(500
|
)
| | | | | |
(3,400
|
)
| | |
(800
|
)
| | |
—
|
| | |
(800
|
)
|
Cash Cost, Before By-product Credits(1) | | | |
189,100
| | | | | | |
37,050
| | | | | | |
226,150
| | | |
126,600
| | | |
38,000
| | | |
164,600
| |
|
Reclamation and other costs
| | | |
2,500
| | | | | | |
240
| | | | | | |
2,740
| | | |
450
| | | |
—
| | | |
450
| |
|
Exploration
| | | |
3,500
| | | | | | |
4,800
| | | |
2,500
| | | |
10,800
| | | |
5,000
| | | |
5,000
| | | |
10,000
| |
|
Sustaining capital
| | | |
51,000
| | | | | | |
3,700
| | | |
2,000
| | | |
56,700
| | | |
45,000
| | | |
18,000
| | | |
63,000
| |
|
General and administrative
| | | |
| | |
| | |
| | |
35,000
| | | |
35,000
|
| | |
| | |
| | |
—
|
|
AISC, Before By-product Credits(1) | | | |
246,100
| | | | | | |
45,790
| | | | | | |
331,390
| | | |
177,050
| | | |
61,000
| | | |
238,050
| |
|
By-product credits
| | | |
(193,000
|
)
| | |
| | |
(18,000
|
)
| | | | | |
(211,000
|
)
| | |
(800
|
)
| | |
(3,000
|
)
| | |
(3,800
|
)
|
|
Cash Cost, After By-product Credits
| | | |
$
|
(3,900
|
)
| | |
| | |
$
|
19,050
|
| | | | | |
$
|
15,150
|
| | |
$
|
125,800
|
| | |
$
|
35,000
|
| | |
$
|
160,800
|
|
|
AISC, After By-product Credits
| | | |
$
|
53,100
|
| | |
| | |
$
|
27,790
|
| | | | | |
$
|
120,390
|
| | |
$
|
176,250
|
| | |
$
|
58,000
|
| | |
$
|
234,250
|
|
|
Divided by ounces produced
| | | |
7,800
| | | | | | |
2,250
| | | | | | |
10,050
| | | |
160
| | | |
50
| | | |
210
| |
|
Cash Cost, Before By-product Credits, per Ounce
| | | |
$
|
24.24
| | | | | | |
$
|
16.47
| | | | | | |
$
|
22.50
| | | |
$
|
791
| | | |
$
|
760.00
| | | |
$
|
783.81
| |
|
By-product credits per ounce
| | | |
(24.74
|
)
| | |
| | |
(8.00
|
)
| | | | | |
(21.00
|
)
| | |
(5
|
)
| | |
(60
|
)
| | |
(18
|
)
|
|
Cash Cost, After By-product Credits, per Ounce
| | | |
$
|
(0.50
|
)
| | |
| | |
$
|
8.47
|
| | | | | |
$
|
1.50
|
| | |
$
|
786
|
| | |
$
|
700
|
| | |
$
|
766
|
|
|
AISC, Before By-product Credits, per Ounce
| | | |
$
|
31.55
| | | | | | |
$
|
20.35
| | | | | | |
$
|
32.97
| | | |
$
|
1,107
| | | |
$
|
1,220.00
| | | |
$
|
1,133.57
| |
|
By-product credits per ounce
| | | |
(24.74
|
)
| | |
| | |
(8.00
|
)
| | | | | |
(21.00
|
)
| | |
(5
|
)
| | |
(60
|
)
| | |
(18
|
)
|
|
AISC, After By-product Credits, per Ounce
| | | |
$
|
6.81
|
| | |
| | |
$
|
12.35
|
| | | | | |
$
|
11.97
|
| | |
$
|
1,102
|
| | |
$
|
1,160
|
| | |
$
|
1,116
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
(1)
|
|
Includes all direct and indirect operating costs related to the
physical activities of producing metals, including mining,
processing and other plant costs, third-party refining and marketing
expense, on-site general and administrative costs, royalties and
mining production taxes, before by-product revenues earned from all
metals other than the primary metal produced at each unit. AISC,
Before By-product Credits also includes on-site exploration,
reclamation, and sustaining capital costs.
|
| |
|
|
(2)
| |
The unionized employees at Lucky Friday have been on strike since
March 13, 2017, and production at Lucky Friday has been limited
since that time. For the first nine months of 2017, costs related to
suspension of full production totaling approximately $11.1 million,
along with $3.3 million in non-cash depreciation expense for that
period, have been excluded from the calculations of cost of sales
and other direct production costs and depreciation, depletion and
amortization, Cash Cost, Before By-product Credits, Cash Cost, After
By-product Credits, AISC, Before By-product Credits, and AISC, After
By-product Credits.
|
| |
|
|
(3)
| |
AISC, Before By-product Credits for our consolidated silver
properties includes corporate costs for general and administrative
expense, exploration and sustaining capital.
|
| |
|
|
(4)
| | Nevada operations acquired on July 20, 2018.
|
| |
|
Reconciliation of Net (Loss) Income (GAAP) to Adjusted EBITDA
(non-GAAP)
This release refers to the non-GAAP measures of adjusted earnings before
interest, taxes, depreciation and amortization ("Adjusted EBITDA"),
which is a measure of our operating performance. Adjusted EBITDA is
calculated as net (loss) income before the following items: interest
expense, income tax provision, depreciation, depletion, and amortization
expense, exploration expense, pre-development expense, acquisition
costs, foreign exchange gains and losses, gains and losses on derivative
contracts, Lucky Friday suspension-related costs, provisional price
gains and losses, stock-based compensation, unrealized gains on
investments, provisions for closed operations, and interest and other
income (expense). Management believes that, when presented in
conjunction with comparable GAAP measures, Adjusted EBITDA is useful to
investors in evaluating our operating performance. The following table
reconciles net (loss) income to Adjusted EBITDA:
|
|
|
|
|
| Dollars are in thousands |
|
|
|
Three Months Ended
|
|
|
|
Nine Months Ended
|
| | | | | | | | | Sept 30, 2018 |
|
|
|
Sept 30,
2017
| | | | Sept 30, 2018 |
|
|
|
Sept 30,
2017
|
| | | | |
Net (loss) income
| | | | $ | (23,184 | ) | | | |
$
|
314
| | | | | $ | (2,870 | ) | | | |
$
|
447
| |
| | | | |
Plus: Interest expense, net of amount capitalized
| | | | 10,146 | | | | |
9,358
| | | | | 30,019 | | | | |
28,423
| |
| | | | |
Plus/(Less): Income taxes
| | | | (2,679 | ) | | | |
(5,130
|
)
| | | | (1,484 | ) | | | |
(17,564
|
)
|
| | | | |
Plus: Depreciation, depletion and amortization
| | | | 43,464 | | | | |
29,518
| | | | | 103,335 | | | | |
86,986
| |
| | | | |
Plus: Exploration expense
| | | | 12,411 | | | | |
7,255
| | | | | 27,609 | | | | |
17,622
| |
| | | | |
Plus: Pre-development expense
| | | | 1,195 | | | | |
1,757
| | | | | 3,615 | | | | |
4,061
| |
| | | | |
Plus: Acquisition costs
| | | | 6,139 | | | | |
—
| | | | | 9,656 | | | | |
25
| |
| | | | |
Plus: Lucky Friday suspension-related costs
| | | | 6,519 | | | | |
4,780
| | | | | 18,337 | | | | |
14,385
| |
| | | | |
Less: Gain on disposition of properties, plants, equipment and
mineral interests
| | | | (3,208 | ) | | | |
(4,830
|
)
| | | | (3,374 | ) | | | |
(4,924
|
)
|
| | | | |
Plus: Stock-based compensation
| | | | 2,232 | | | | |
1,347
| | | | | 4,636 | | | | |
4,951
| |
| | | | |
Plus: Provision for closed operations and environmental matters
| | | | 1,317 | | | | |
1,680
| | | | | 3,957 | | | | |
3,379
| |
| | | | |
Plus/(Less): Foreign exchange loss (gain)
| | | | 2,212 | | | | |
4,917
| | | | | (2,856 | ) | | | |
10,258
| |
| | | | |
Plus/(Less): Losses (gains) on derivative contracts
| | | | (19,460 | ) | | | |
11,226
| | | | | (40,271 | ) | | | |
16,548
| |
| | | | |
(Less)/Plus: Provisional price losses/(gains)
| | | | 640 | | | | |
(1,244
|
)
| | | | 3,272 | | | | |
(564
|
)
|
| | | | |
Plus/(Less): Unrealized (gains)/loss on investments
| | | | — | | | | |
—
| | | | | — | | | | |
—
| |
| | | | |
(Less)/Plus: Other
| | | | 2,589 |
| | | |
(417
|
)
| | | | 2,791 |
| | | |
(945
|
)
|
| | | | |
Adjusted EBITDA
| | | | $ | 40,333 | | | | |
$
|
60,531
| | | | | $ | 156,372 | | | | |
$
|
163,088
| |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
Reconciliation of Cash Provided by Operating Activities (GAAP) to
Free Cash Flow (non-GAAP)
This release refers to a non-GAAP measure of free cash flow, calculated
as cash provided by operating activities, less additions to properties,
plants, equipment and mineral interests. Management believes that, when
presented in conjunction with comparable GAAP measures, free cash flow
is useful to investors in evaluating our operating performance. The
following table reconciles cash provided by operating activities to free
cash flow:
|
|
|
|
|
| Dollars are in thousands |
|
|
|
Three Months Ended
|
|
|
|
Nine Months Ended
|
| | | | | | | | | Sept 30, 2018 |
|
|
|
Sept 30,
2017
| | | | Sept 30, 2018 |
|
|
|
Sept 30,
2017
|
| | | | |
Cash provided by operating activities
| | | | $ | 28,192 | | | | |
$
|
28,294
| | | | | $ | 75,210 | | | | |
$
|
74,115
| |
| | | | |
Less: Additions to properties, plants equipment and mineral interests
| | | | (39,981 | ) | | | |
(24,426
|
)
| | | | (83,285 | ) | | | |
(70,390
|
)
|
| | | | | | | | |
| | | |
| | | |
| | | |
|
| | | | |
Free cash flow
| | | | $ | (11,789 | ) | | | |
$
|
3,868
|
| | | | $ | (8,075 | ) | | | |
$
|
3,725
|
|
| | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|

View source version on businesswire.com: https://www.businesswire.com/news/home/20181108005303/en/
Hecla Mining Company
Mike Westerlund, 800-HECLA91 (800-432-5291)
Vice
President - Investor Relations
hmc-info@hecla-mining.com
www.hecla-mining.com
Source: Hecla Mining Company